Home / Amended AFP for Lease of Discovery Park at Michoud Assembly… / Document

QUESTION AND ANSWER SHEET WITH UPDATES Rev 1

Updated

A PDF document (537 KB) attached to Amended AFP for Lease of Discovery Park at Michoud Assembly Facility, from the National Aeronautics and Space Administration. Due Jan 25, 2027, 5:00 PM (UTC-5).

File name: QUESTION AND ANSWER SHEET WITH UPDATES_Rev 1_11.16.26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

QUESTION AND ANSWER SHEET

WITH UPDATES TO AMENDED AFP

AGENCY ANNOUNCEMENT FOR PROPOSALS (AFP)

FOR LEASE OF DISCOVERY PARK AT MAF

AFP-MAF-DISCOVERY-2026

1. Q: In general, how flexible is NASA in deviating from and negotiating the terms of the model lease, especially pertaining to term, rent amount, etc.?
A: NASA generally follows the lease term and FMV range set in the AFP. There may be flexibility to negotiate business and operational terms such as renewal options, commencement dates, tenant improvements, and operating responsibilities. However, material changes to term or rent typically require documented justification and additional approvals. The model lease should therefore be treated as the baseline, with flexibility assessed case by case
2. Q : The Model lease calls for annual payments. Is there any way to make smaller additional payments throughout the year, like monthly payments?
A: Quarterly payments are the standard alternative, if not paying annually.

Page 1|6

3. Q: Regarding the term of the lease, we would envision initial and renewal term periods to be 10 years each, with a maximum full term of 99 years. Is this possible? A: NASA will consider lease terms outside of what was stated in the AFP, please provide preferred term in your proposal.
4. Q: The purpose of our lease is to build a distribution center that will house shipping containers transported from the impending LA International Terminal. We obviously would like to be careful about pulling the trigger on a long-term lease and then something happening with the port. Would NASA consider an option where we have 24 months from signing for the actual commencement to start? The idea would be that if something happens with the port, we are able to pull out, but if the Port goes forward, we have the two years to build and make sure it’s ready for when the port is completed. A: Delayed commencement is possible, please provide within your proposal. Historically, NASA has kept to a 12-month maximum delay in commencement.
5. Q: Considering the proposed use above (in question 4), besides the obvious, should we be concerned about any regularly-shipped products or materials that might violate the Permitted Uses section, 4.1(C)? A: Tenant's Permitted Use shall comply with applicable Federal, state and local laws. Products to be shipped should be included in your proposal for NASA’s review. 6. Q: Does the language stated on Page 3, Section I.C. of the AFP disqualify someone from proposing to the

The beginning of the document. Download the full file to read on.

Other documents in this bid