Project No.
Project
WA NP OLYM 12(8)
Hurricane Ridge Rockfall Mitigation MP 9.4
Check General or Technical
#
General
Technical
Question
Answer
Date
I cannot find the geotechnical report. Can you
send that to me?
The Final Geotechnical report, olym128_GEO_11-24.pdf, is available in the zipped Physical Data file [Physical Data_WA NP
OLYM 12(8).zip] posted under
"Attachments" on SAM.gov
10/16/26
X
I was wondering if you have a list of potential
bidders for this project?
The Government does not provide this since
bidders may obtain the registered vendors
list (aka planholders list) from sam.gov after
linking their entity to their registration. If
you are signed into SAM.gov with your
registered entity and you cannot see the
Interested Vendors List, you will need to be
assigned the Contract Opportunities
Administrator role for your entity in
SAM.gov.Go to
https://www.fsd.gov/gsafsd_sp if you need
additional assistance.
10/26/26
X
The Government does not provide this since
bidders may obtain the registered vendors
We saw the Hurricane Ridge Rockfall Mitigation list (aka planholders list) from sam.gov after MP 9.4 project on SAM.gov, but were unable to linking their entity to their registration. If locate a list of potential planholders or
you are signed into SAM.gov with your
prospective general bidders.
registered entity and you cannot see the
Interested Vendors List, you will need to be
Could you please provide a list of general
assigned the Contract Opportunities
contractors who intend to bid on this project so Administrator role for your entity in we can submit our proposal to them?
SAM.gov.Go to
https://www.fsd.gov/gsafsd_sp if you need
additional assistance.
10/27/26
X
Can you please indicate what bid line item the
Refer to Subsections 269.05, 262.06, and
safety scaling and hazard tree removal from the
262.09.
chute will be paid under?
10/28/26
X
Will you also confirm if FHWA will allow
sacrificial steel and galvanization for the double Bid according to the project plans and corrosion protection of the soil nails? Instead of specifications. the solid bar depicted in the plans.
10/28/26
X
X
Could FHWA please provide or identify the
relevant drawings showing the intended MRB
location and relationship to the temporary
concrete traffic barriers? We have been unable
to identify these details on the drawings
provided.
X
Would FHWA accept an alternative engineered
temporary rockfall barrier system in lieu of the