Questions from 1240LT27Q0025 – Kalamazoo Fence

1. Existing-fence removal: Drawing D-2 calls for removal of roughly 13.1 miles of burned and unburned fence and off-site disposal. The SOW describes approximately 0.5 miles of new fence, and D-1 states there is no existing fence line to follow. Is removal included? If so, please provide its quantity, mapped locations, removal and disposal requirements, and pay item. If not, please amend the conflicting drawing notes.
Getting the drawings redone and resigned will take time. Can you tell the bidders there is no removal.

2. Quantity and payment: The SOW and SF1442 describe approximately 2,500 feet, including an estimated four 12-foot gates, as a lump sum. C04a lists 2,640 feet under item 619-01, method “DQ,” plus separate mobilization. D-2 specifies measurement by linear mile along the bottom-wire slope, including gate openings. Which quantity and payment method govern? Are the four gates, braces and cattleguard connections included in item 619-01?
The SOI items govern. All work in included in the two items. 3. Offer guarantee: SF1442 block 13(b) requires an offer guarantee. Please specify the required amount or percentage, permitted form and submission requirements, including whether it must accompany the December 4 quotation.

Answer: Bid guarantee is 100% of price, submitted with quote. FAR 52.228-1. 4. Post-award bonds and payment protection: SF1442 requires performance and payment bonds within 15 calendar days after award, while page 14 describes payment protection equal to 100% of the contract price within 10 days. Please confirm the required security instruments, when alternatives are permitted, and the governing amounts, deadlines and duration.
Answer: Over 35K, a payment bond is required within 15 days of award notice and over 150K the payment and performance bonds are required within the 15 days of award notice.

FAR 52.228-15

5. Complete documents: The SF1442 PDF has 19 pages but is numbered “of 20.” Is a page missing? Please provide it if applicable.
Answer: It is 19 Pages, no pages missing.
Please also identify or provide the Forest Service Supplement and edition referenced in C04b, section 1.9.
No FS Supplement. Design based on FP-24 Standard Specifications. 6. Bracing: D-2 requires corner braces at alignment changes of 20 degrees or more and inline braces at intervals not exceeding 1,320 feet. D-3’s brace table uses 30degree categories and run lengths through 990 feet. Which criteria govern? Please