Questions and Answers Life Safety Drawing

Updated

A Word document (32 KB) attached to Life Safety Drawings, from the Department of Veterans Affairs. Due Nov 20, 2026, 3:00 PM (UTC-7).

File name: Questions and Answers Life Safety Drawing .docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Questions Life Safety Drawings

Can you confirm the due date for this RFQ is 11/20/2026 and not 11/04/2026. RFQ will close on 11/20/2026 at 3pm MST. What is the anticipated award date of contract? NLT 12/08/2026 Under General Requirements it states all work to be completed by December. Can you please clarify if this is December 2026 or 2027? CY27 Q2.

No.
Solicitation Reference
Question / Clarification Requested
Pricing/Scope Impact
SOW 6 (p. 34);
B.2 Period of Performance (p. 4)
The SOW requires completion “by end of
December,” but the base period of performance
begins 12-09-2026. Confirm the required draft and
Staffing and schedule

final delivery dates for the base year and the target survey and delivery month for each option year. December 8, 2027, for the Base year. For each Option Year has the final delivery date as stated 12/08/2028 OY1; 12/08/2029 OY2; 12/08/2030 OY3; 12/08/2031 OY4.

SF1449 Block 8 and p. 1; E.1 (p. 42)
The SF1449 lists offers due 11-20-2026 and questions due 11-14-2026, while E.1 lists Nov 4 and Oct 30. The subject line on p. 1 shows RFQ 36C26226Q0047 rather than 36C26227Q0047. Confirm the governing dates and RFQ number. Questions are due 11/13/2026 and quotes are due 11/20/2026. RFQ36C26227Q0047 Submission compliance
SOW 6.1 and 6.9
Provide separate square footage for the Building 1 and Building 11 interstitial levels. Confirm whether interstitial spaces are walkable full-height levels, the extent of ACM, whether the VA provides air monitoring/PPE or abatement before entry, and whether above-ceiling observation in ACM areas is expected.

Interstitial spaces vary with floor and are not fully walkable at full-height. PPE to be furnished by contractor. Above ceiling observation in ACM areas are required.

Building 1
Floor 1 interstitial: 175,050
Floor 2 Interstitial: 100,407
Floor 3 Interstitial: 99,430
Floor 4 Interstitial: 102,323
Floor 5 Interstitial: 97,948
Floor 6 Interstitial: 97,971
Floor 7/PH Mechanical: 5,662
Floor 8/PH Level 2 Mechanical: 2,874

Building 11
Basement Interstitial: 27,480
Floor 1 Interstitial: 29,592
Survey hours, safety, and PPE cost
SOW 6.2
Confirm the December 2025 CAD files include current architectural backgrounds compliant with VA CAD standards, the estimated percentage of square footage renovated since December 2025, and any active construction areas.

December 2025 CAD files are VA CAD standard compliant. Assume 50,000 square foot renovation and/or currently under construction since December 2025.

The beginning of the document. Download the full file to read on.