Questions for B34 and B42 DWV System Smoke Testing & Hydro Jetting:
Could you please provide available DWV plumbing drawings, building floor plans, sewer line layouts, pipe sizes, estimated pipe lengths, and cleanout/access locations for Buildings 34 and 42? The SOW appears to include only a site location map. CAD drawings attached. Please confirm how inaccessible piping sections should be addressed and whether any estimated system quantities or existing inspection records are available. Any piping sections that are inaccessible shall be documented in the final inspection report, including locations and the reason access was not possible. We do not have any existing inspection records available.
The solicitation requires after-hours work. Please confirm the permitted working hours and whether weekend work is authorized. Building 34 the hours for work will be between the hours of 6:00 PM – 5:30 AM. Building 42 can be done during normal business hours.
Please confirm whether a bid guarantee is required with the quotation, the required performance and payment bond amounts, and the applicable insurance coverage limits.
May the prime contractor utilize a qualified subcontractor's experience and project references to satisfy the minimum three-year experience and five-project requirements? Additionally, which limitation-on-subcontracting percentage applies? Yes.
Please confirm which construction-specific requirements, including bonding, QC procedures, three-phase inspections, and the one-year warranty, apply to this inspection-only project where repairs are not authorized.
Please confirm whether CCTV video recording is permitted within the installation and whether any security approval or restrictions apply to the required video footage and USB submission. Yes. Security approval is not needed for this requirement.
Please clarify the required level of detail for the final inspection reports, including pipe-location documentation, footage labeling, and acceptance criteria. The final inspection report shall include the location of all piping inspected, identification of any deficiencies found, and documentation of inaccessible sections. All CCTV footage will be clearly labeled by building and pipe location. The report shall include findings, recommendations, and supporting photos.
The SOW scopes the "entire" DWV and sanitary systems but states no quantities. Please provide, per building: total linear feet of mains, branch lines, and stacks to be jetted/inspected; pipe diameter range; and number of cleanouts/access points — or confirm pricing is a single lump sum per building regardless of quantity. We do not have quantities of DWV systems. Inspect and jet and camera what can be done and document any sections that cannot be completed.