NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Glenn Research Center (GRC)

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

(JOFOC)

For Glenn Multiple Award Construction Contract 2 (GMACC-2)

80GRC020D0008

80GRC020D0009

80GRC020D0012

80GRC020D0013

1. Federal Acquisition Regulation (FAR) 6.104-1(a)(1) – Identification of the agency and the contracting activity, and specific identification of the document as a “Justification for other than full and open competition.”
This document is a justification for other than full and open competition prepared by National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC). The procuring agency is NASA, and the contracting activity is GRC. 2. FAR 6.104-1(a)(2) – The nature and/or description of the action being approved: This JOFOC, and a continuation of services, is needed because a follow-on Multiple Award Construction Contract (MACC) will not be ready for award prior to the GMACC-2 Period of Performance (PoP) end date of September 30, 2026.
This justification provides the rationale for contracting by other than full and open competition to award an extension to the following active GMACC-2 contracts: 80GRC020D0008 - PPW Builders, Inc.
80GRC020D0009 - Erie Affiliates, Inc.
80GRC020D0012 - Pinnacle Construction Development Group 80GRC020D0013 - R.J. Runge Company, Inc.
Two (2) six-month extensions are requested to provide time for a follow-on MACC to be developed and awarded. The current GMACC-2 PoP, inclusive of all options and six-month extension, is April 1, 2020, through September 30, 2026. This is a time only extension and the contract value will not be increased. GRC is requesting the following extension periods: •
•

Initial six-month extension ----------------------- October 01, 2026, through March 31, 2027 Optional six-month extension ------------------ April 01, 2027, through September 30, 2027

Rev.:4/2026

3. FAR 6.104-1(a)(3) – A description of the supplies or services required, to meet the Agency’s needs (including the estimated value):
The GMACC-2 contract is needed to meet the continuing construction and facility maintenance requirements at GRC, consisting of both Lewis Field in Cleveland, Ohio and Neil A. Armstrong Test Facility (ATF) in Sandusky, Ohio. GMACC-2 is the primary contract vehicle for GRC’s construction needs and provides new construction, rehabilitation, and modification of facilities and infrastructure, such as: •

Structural: The work activities in this area shall include, but are