Redacted Statement of Work Rev
Updated
A PDF document (243 KB) attached to Small Business Set Aside for MK68 Spare and Repair Parts Fabrication IAW the attached NAVSEA Drawing, SOW, and ALL additional attachments. Request Access to drawings through SAM. Provide your Cage Code when requesting access in SAM., from the Department of the Navy. Due Oct 27, 2026, 11:00 AM (UTC-5).
File name: A04 Redacted SOW Rev 1301418413.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
FOR
MK68 SPARE AND REPAIR PARTS FABRICATION
15 October 2026
1.0
SCOPE
The Naval Surface Warfare Center Panama City Division (NSWC PCD) has a requirement for the acquisition and fabrication of spare and repair parts for the MK68 System. The contractor shall provide all materials, facilities, and personnel to accomplish all tasks specified below. 2.0
APPLICABLE DOCUMENTS
The following documents of the exact issue form a part of this SOW to the extent specified herein. In the event of conflict between the documents referenced and the contents of this Statement of Work, the contents of this Statement of Work shall take precedence. Second tier and lower reference documents (i.e., those referenced in the primary references) shall be used for guidance only.
2.1
Military Standards
None
2.2
Military Specifications
None
2.3
Other Documents
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
p)
q)
r)
s)
t)
u)
v)
w)
x)
y)
z)
Drawing 9007920
Drawing 8905617
Drawing 8905618
Drawing 8719611
Drawing 8719610
Drawing 8719612
Drawing 8719642
Drawing 9008064
Drawing 8719728
Drawing 8719730
Drawing 8724809
Drawing 8905619
Drawing 8905621
Drawing 8905625
Drawing 8905627
Drawing 8905630
Drawing 6665799
Drawing 8905629
Drawing 8905628
Drawing 9007929
Drawing 9007930
Drawing 6665905
Drawing 8873713
Drawing 8748827
Drawing 8905593
Drawing 8905606
Bore Rod Gag Pin Lanyard Assembly
Gag Pin Lanyard Sub Assembly
Lanyard Tube Assembly
Gag Pin, Bore Rod
Thimble, Gag Pin
Fusible Link
Cap, Lanyard
Hook Strap
Cap, Upper, Lanyard Tube
Lanyard Tube
Tube Mount, Lower
Cap, Lower, Lanyard Tube
Tube Mount, Upper
Housing, Control, Underwater Mine EX 1 MOD 0
TIM Assembly
MK 68 MOD 1 TDD Adapter Harness
Housing Adapter MK 157
TIM CCA
TIM Housing
Schematic, TIM
PCB, TIM
Connector, D-Subminiature, 3-Pin
MK 68 MOD 1 Thermal Battery Connector Assembly
Shorting Plug, Thermal Battery
End Cap, MOD1
Muzzle Cap, MOD1
aa)
bb)
cc)
3.0
Drawing 8719603
Drawing 8719605
Drawing 8718612
Bore Rod Cap Assemblies
Bore Rod Cap Cylinder
Fusible Link
REQUIREMENTS
3.1
Fabrication Support
The contractor shall fabricate and assemble the items specified below in the quantities specified below. The contractor shall conduct testing and inspection to ensure, when fielded, the components meet the requirements
The beginning of the document. Download the full file to read on.