Home / Slat, Aircraft LH7/RH7 / Document

Request for Information Rev02

Updated

A Word document (26 KB) attached to Slat, Aircraft LH7/RH7, from the Defense Logistics Agency. Due Nov 13, 2026, 4:30 PM (UTC-5).

File name: Request for Information 14 Oct 2026 Rev02.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Request for Information for SLAT, AIRCRAFT LH7

CAUTION:

The Government is conducting market research to identify potential sources that possess the expertise, capabilities, and experience to meet the requirements for qualification and production of: NSN 1560007742115UC, SLAT, AIRCRAFT LH7 / P/N- 4J10048-120G, T.O. 1C-5M-4-5 F/24 I/35 NSN 1560007742114UC, SLAT, AIRCRAFT RH7 / P/N- 4J10048-119G, T.O. 1C-5M-4-5 F/24 I/35 The level of security clearance and amount of foreign participation in this requirement has not been determined. The Government’s Best Estimated Quantities for this requirement are in the table below. The requirement to procure the NSNs in the table below is not anticipated past OP5 and total are 42 including First Articles. Best Estimated Quantities

NSN
P/N
Ordering Period Qty

First Article
OP1
OP2
OP3
OP4
OP5
1560007742115UC
4J10048-120G
Best Estimated Quantities

NSN
P/N
Ordering Period Qty

First Article
OP1
OP2
OP3
OP4
OP5
1560007742114UC
4J10048-119G
According to the AFMC Form 761 for this NSN Screening Analysis Worksheet, the AMC/AMSC for this item is 1/G. AMC = Acquisition Method Code
AMSC = Acquisition Method Suffix Code
1 = Suitable for competitive acquisition for the first time. /G = The Government has rights to the technical data, the data package is complete, and there are no technical data, engineering, tooling or manufacturing restriction. This is only AMSC that implies that parts are candidates for full and open competition. Contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility. Contractor will need to obtain or already have a Secret level of security clearance. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.

INSTRUCTIONS:

The document(s) below contains a description of the of NSN 1560007742115UC, SLAT, AIRCRAFT LH7 / P/N- 4J10048-120G, T.O. 1C-5M-4-5 F/24 I/35 and NSN 1560007742114UC, SLAT, AIRCRAFT RH7 / P/N- 4J10048-119G, T.O. 1C-5M-4-5 F/24 I/35. The Survey allows Contractors to provide their company’s capability. If, after reviewing these documents, you desire to participate in market research, you should provide documentation that supports your company’s capability in meeting these requirements. Failure to provide documentation may result in the government being unable to adequately assess your capabilities. If you lack sufficient experience in a particular area, please provide details explaining how you would overcome the lack of experience/capabilities to perform that portion of the requirement (i.e., teaming, subcontracting, etc.)

The beginning of the document. Download the full file to read on.