Home / F-15 Universal Serial Bus Data Transfer Module Reader… / Document

Request for Information UDTMR 2026

Updated

A PDF document (184 KB) attached to F-15 Universal Serial Bus Data Transfer Module Reader (UDTMR) Retrofit Kits, from the Department of the Air Force. Due Dec 10, 2026, 5:00 PM (UTC-5).

File name: RFI_UDTMR_2026.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

REQUEST FOR INFORMATION

F-15 Universal Data Transfer Module Reader (UDTMR)
Retrofit Kit Program
Robins AFB, GA

16 September 2026

CAUTION:

The Government is conducting market research to identify potential commercial and noncommercial sources that possess the expertise, capabilities, and capacity to manufacture, assemble, test, and deliver Universal Series Bus (USB) Data Transfer Module Reader (UDTMR) Retrofit Kits for the United States Air Force (USAF) F-15 fleet. The Government possesses a complete Technical Data Package (TDP) developed organically by the 402nd Electronics Maintenance Group (EMXG) at the request of AFLCMC/WAQ. The TDP includes assembly and component drawings, bill of materials (BOM), test procedures, firmware installation instructions, and operations guides. Contractor-furnished materials or parts used for production shall equal or exceed the specifications identified in the Government-provided TDP. Government Network and Fully Automated Debrief System (FADS) Access Requirement. The Government anticipates that any future solicitation resulting from this market research will require the contractor to provide personnel who already possess active Common Access Cards (CACs) and currently authorized access to the Government network environment required to conduct UDTMR acceptance testing.
UDTMR acceptance testing requires access to the FADS and the ability to test a powered-on, fully assembled UDTMR Retrofit Kit installed in the applicable DTMR shell. The Government’s objective is to avoid schedule delays associated with initial CAC issuance, initial networkaccount creation, or initial FADS-access provisioning after contract award. Respondents shall identify whether they can provide, at the time of contract award, personnel with active CACs and existing authorization to access the required Government network and FADS test environment at Robins AFB, GA or Eglin AFB, FL. Possession of a CAC alone is insufficient. Respondents must identify whether their personnel have the required network account, system authorization, physical access, and FADS access necessary to execute the required acceptance testing.

NOTE: THIS IS A REQUEST FOR INFORMATION (RFI) ONLY. Companies are

encouraged to provide responses to this questionnaire but are advised that their participation is voluntary only. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not

The beginning of the document. Download the full file to read on.