Request for Proposals A.1 Statement of Work Div01 FY27 ShopAdams
Updated
A PDF document (845 KB) attached to Access Control Point (ACP) Active Vehicle Barrier (AVB) Systems and Guard Booths, from the Department of the Army. Due Nov 18, 2026, 9:00 AM (UTC-6).
File name: RFP A.1 SOW Div01 FY27 ShopAdams 260826.pdf
The full file is for paid members, or buy this bid alone.
Preview
SHOPPADAMS
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.10
01 14 00
01 20 00
01 30 00
01 32 01.00 10
01 33 00
01 33 16.00 10
01 35 26
01 42 00
01 45 00
01 45 00.15 10
11/22, CHG 5: 05/25
11/20, CHG 5: 02/25
11/20, CHG 5: 02/25
08/23, CHG 1: 08/24
08/18, CHG 4: 02/21
05/24, CHG 1: 05/25
08/23, CHG 3: 08/25
01 50 00
11/20, CHG 3: 08/24
01 57 19
01 58 00
01 74 19
08/22, CHG 2: 08/25
08/19, CHG 5: 08/22
02/19, CHG 3: 11/21
01 78 00
01 78 23
01 78 24.00 10
05/19, CHG 1: 08/21
05/23, CHG 1: 05/25
STATEMENT OF WORK
WORK RESTRICTIONS
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
PROJECT SCHEDULE
SUBMITTAL PROCEDURES
DESIGN DATA (DESIGN AFTER AWARD)
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY DATA REQUIREMENTS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SHOPPADAMS
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.10
STATEMENT OF WORK
PART 1
GENERAL
1.1
REFERENCES
1.2
WORK COVERED BY CONTRACT DOCUMENTS
1.2.1
Project Title and Location
1.2.2
Project Description
1.2.3
TASK ELEMENTS
1.2.3.1
AVBCS DESIGN SHOP ACP - CLIN 0001
1.2.3.2
AVBCS CONSTRUCTION SHOP ACP - CLIN 0002
1.2.3.3
OPTIONAL AVBCS DESIGN ADAMS ACP - CLIN 0003
1.2.3.4
OPTIONAL AVBCS CONSTRUCTION ADAMS ACP - CLIN 0004
1.2.3.5
OPTIONAL ID CHECK RECONFIGURATION DESIGN - CLIN 0005
1.2.3.6
OPTIONAL ID CHECK RECONFIGURATION CONSTRUCTION - CLIN 0006
1.2.3.7
OPTIONAL PVB DESIGN ADAMS ACP - CLIN 0007
1.2.3.8
OPTIONAL PVB CONSTRUCTION ADAMS ACP - CLIN 0008
1.2.3.9
OPTIONAL PVB DESIGN SHOP ACP - CLIN 0009
1.2.3.10
OPTIONAL PVB CONSTRUCTION SHOP ACP - CLIN 0010
1.2.3.11
OPTIONAL TRANSFORMER SHOP ACP - CLIN 0011
1.2.4
DETAILED TASK ELEMENTS
1.2.5
EXISTING INSTALLATION INFORMATION
1.3
SECURITY REQUIREMENTS
1.4
GOVERNMENT OCCUPANCY OF PREMISES
1.5
CONTRACTOR ACCESS AND USE OF PREMISES
1.6
EXISTING WORK
1.7
LOCATION OF UNDERGROUND FACILITIES
1.8
DESIGN REQUIREMENTS
1.9
CERTIFICATION OF WORK
PART 2
PRODUCTS
PART 3
EXECUTION
PART 4
ADDENDUMS/ENGINEERING CHANGE PROPOSALS (ECP)
-- End of Section Table of Contents --
SECTION 01 11 00.10
SHOPPADAMS
01 11 00.10
STATEMENT OF WORK
PART 1
1.1
GENERAL
REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic
The beginning of the document. Download the full file to read on.