PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.10

01 14 00

01 20 00

01 30 00

01 32 01.00 10

01 33 00

01 33 16.00 10

01 35 26

01 42 00

01 45 00

01 45 00.15 10

11/22, CHG 5: 05/25
11/20, CHG 5: 02/25
11/20, CHG 5: 02/25
08/23, CHG 1: 08/24
08/18, CHG 4: 02/21
05/24, CHG 1: 05/25
08/23, CHG 3: 08/25

01 50 00

11/20, CHG 3: 08/24

01 57 19

01 58 00

01 74 19

08/22, CHG 2: 08/25
08/19, CHG 5: 08/22
02/19, CHG 3: 11/21

01 78 00

01 78 23

01 78 24.00 10

05/19, CHG 1: 08/21
05/23, CHG 1: 05/25

STATEMENT OF WORK

WORK RESTRICTIONS

PRICE AND PAYMENT PROCEDURES

ADMINISTRATIVE REQUIREMENTS

PROJECT SCHEDULE

SUBMITTAL PROCEDURES

DESIGN DATA (DESIGN AFTER AWARD)

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS

PROJECT IDENTIFICATION

CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

CLOSEOUT SUBMITTALS

OPERATION AND MAINTENANCE DATA

FACILITY DATA REQUIREMENTS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SHOPPADAMS

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.10

STATEMENT OF WORK

PART 1

GENERAL

1.1

REFERENCES

1.2

WORK COVERED BY CONTRACT DOCUMENTS

1.2.1
Project Title and Location
1.2.2
Project Description
1.2.3

TASK ELEMENTS

1.2.3.1

AVBCS DESIGN SHOP ACP - CLIN 0001

1.2.3.2

AVBCS CONSTRUCTION SHOP ACP - CLIN 0002

1.2.3.3

OPTIONAL AVBCS DESIGN ADAMS ACP - CLIN 0003

1.2.3.4

OPTIONAL AVBCS CONSTRUCTION ADAMS ACP - CLIN 0004

1.2.3.5

OPTIONAL ID CHECK RECONFIGURATION DESIGN - CLIN 0005

1.2.3.6

OPTIONAL ID CHECK RECONFIGURATION CONSTRUCTION - CLIN 0006

1.2.3.7

OPTIONAL PVB DESIGN ADAMS ACP - CLIN 0007

1.2.3.8

OPTIONAL PVB CONSTRUCTION ADAMS ACP - CLIN 0008

1.2.3.9

OPTIONAL PVB DESIGN SHOP ACP - CLIN 0009

1.2.3.10

OPTIONAL PVB CONSTRUCTION SHOP ACP - CLIN 0010

1.2.3.11

OPTIONAL TRANSFORMER SHOP ACP - CLIN 0011

1.2.4

DETAILED TASK ELEMENTS

1.2.5

EXISTING INSTALLATION INFORMATION

1.3

SECURITY REQUIREMENTS

1.4

GOVERNMENT OCCUPANCY OF PREMISES

1.5

CONTRACTOR ACCESS AND USE OF PREMISES

1.6

EXISTING WORK

1.7

LOCATION OF UNDERGROUND FACILITIES

1.8

DESIGN REQUIREMENTS

1.9

CERTIFICATION OF WORK

PART 2

PRODUCTS

PART 3

EXECUTION

PART 4

ADDENDUMS/ENGINEERING CHANGE PROPOSALS (ECP)

-- End of Section Table of Contents --

SECTION 01 11 00.10

SHOPPADAMS

01 11 00.10

STATEMENT OF WORK

PART 1

1.1

GENERAL

REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic