SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

1. SOLICITATION NO.

33330226RT0010015

PAGE OF PAGES

3. DATE ISSUED

SEALED BID (IFB)

x NEGOTIATED (RFP)

(Construction, Alteration, or Repair)

09/14/2026

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

OCON

SMITHSONIAN INSTITUTION

MRC 1200
PO Box 37012
Washington DC 20013-7012

9.

FOR

INFORMATION

CALL:

6. PROJECT NO.

Office of Contracting and Personal Property M

MRC 1200, PO Box 37012

Washington, DC 20013-7012

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

a. NAME

Virginia

Chan

202-633-7253

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

(Title, identifying no., date)

This Request for Proposals (RFP) is for Smithsonian Institution's National Zoological Park (NZP) Construction of Phase 2 - Habitats & Animal Care Building for the Arabian Leopard Facility (ALF) (SF Project # 2533105), located at 3001 Connecticut Ave NW, Washington, DC 20008. Phase 1 - Early Site was solicited previously from IDIQ Contractors, has been awarded, and is in progress. At the conclusion of Phase 1, the successful offeror will be expected to take over responsibility from the Phase 1 General Contractor for site logistics and overlapping scope, including, but not limited to, the laydown area, erosion and sediment control (E&S) measures, the sound wall, and temporary utilities. The Contractor receiving the award shall provide all supervision, labor, materials and equipment necessary to perform construction services to complete the work as described in this RFP below and the Contract Documents (as defined in Section B of this RFP), including, without limitation, the Drawings and Specifications for SF Project No. 2533105 dated June 15, 2026, attached hereto as Appendix 1-2. All work shall be done in accordance with applicable codes and regulations. This RFP consists of the following: This Standard Form 1442; Sections A-M, p. 1-139;
Continued ...

11. The Contractor shall begin performance

award,

x notice to proceed.

The performance period is

calendar days and complete it within
x mandatory

calendar days after receiving
Specs dated 06/15/2026

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)