ATTACHMENT 02

OFFEROR’S REQUEST FOR CLARIFICATIONS

Request for Proposal No: SLAC_RFP_367827(RE)
Site-wide Crane Inspection & Troubleshooting

ITEM

DATE

SUBMITT

ED

RFP DOCUMENT

REFERENCE

QUESTION

RESPONSE

RESPONSE

DATE

RFP ACTIONS

11/10/26

SOW §3.1; Section B
Items 01–02

Equipment list. Please provide the asset list for the ~275 assets, including for each: asset ID, building/location, equipment type, rated capacity, span and lift/hook height, manufacturer/model, hoist type, control type (pendant/radio/cab, VFD, PLC), approximate height above floor for inspection access, and date of last annual and last quadrennial inspection. Firm fixed pricing cannot be accurately prepared from category counts alone.

Building numbers and specific locations cannot be
provided prior to award; the selected Subcontractor will verify locations and building numbers post-award. SLAC
will provide an equipment make and model breakout via
solicitation amendment.
The maximum inspection access height above the floor is 60–80 feet.
The most recent annual inspections were completed in
Q4 FY2026 (July–September 2026). Approximately 200
cranes will require quadrennial inspections across
FY2027–FY2029.

11/13/26

N/A

11/10/26

SOW §3.2
(Quadrennial)

Quadrennial scope. Please identify which assets require a quadrennial inspection in the Base Period and in each Option Period. Does SLAC intend the quadrennial inspection to include a proof load test? If so, please state the required test load (e.g., 125% of rated capacity) and whether SLAC will furnish test weights, rigging and handling equipment, or whether these are to be furnished by the Subcontractor.

Quadrennial inspections require a proof load test at
11/13/26
125% of rated capacity. SLAC will provide the test weights and rigging; any additional handling or testing equipment must be furnished by the Subcontractor.
The estimated quadrennial inspection crane counts by
period are:
• Base Period (FY27): 4
• Option Year 1 (FY28): 134
• Option Year 2 (FY29): 62

N/A

11/10/26

SOW §3.2
(Annual/Quadrennial)
; SOW §1

Regulatory basis. Please identify which assets SLAC considers subject to Cal/OSHA crane certification under Title 8 CCR §5021 (annual certification and quadrennial load test by a Cal/OSHAaccredited certifier), and which assets are to receive annual/periodic inspections by a Qualified Person under ASME B30 only.

All inventory items under this requirement are subject to Cal/OSHA crane certification in addition to applicable