Request for Quotations Attachment 1 Performance Work Statement Kings Bay
Updated
A PDF document (282 KB) attached to Washer/Dryer Lease and Maintenance, Naval Submarine Base (NSB), Kings Bay, GA, from the Department of the Navy. Due Nov 6, 2026, 3:00 PM (UTC-5).
File name: RFQ_Attachment_1_PWS_Kings_Bay.pdf
The full file is for paid members, or buy this bid alone.
Preview
Performance Work Statement (PWS)
For
Washer and Stacked Dryer Lease and Maintenance
Service
Naval Submarine Base – Kings Bay, Georgia
PERFORMANCE WORK STATEMENT (PWS)
1.0 INTRODUCTION
1.1 Description of Services
This PWS is developed to support Commander, Navy Region Southeast (CNRSE) to provide Washer and Stacked Dryer Lease and Maintenance Services in support of naval personnel at Naval Submarine Base, Kings Bay, GA (NSB KB).
1.2 Background
CNRSE manages and oversees shore installation management support and execution for 18 installations. Installation locations are within the Southeastern United States, including Alabama, Arkansas, Florida, Georgia, Kansas, Louisiana, Mississippi, Missouri, Oklahoma, South Carolina, Tennessee, Texas, and Guantanamo Bay, Cuba Naval Submarine Base. NSB KB, Georgia provides support to the fleet, fighter and family by maintaining and operating the facilities of the Trident submarine force stationed here. In support of naval personnel, the provision of washers and stacked dryers in the housing facilities are required in conjunction with the maintenance of the appliances.
1.3 Objectives
To provide washer and stacked dryer leased units and maintenance of those units in support of naval personnel with flexible, efficient and cost-effective contracted service support.
1.4 Estimated Quantities
Fluctuations in base personnel and/or requirements may necessitate increases or decreases in quantities required. In such events, the Contractor shall either furnish additional appliances (washers and stacked dryers) or remove excess appliances (Government-owned and leased) as directed by Government in accordance with the terms set forth in this contract. Quantity increases or decreases for leased washers and stacked dryers will require a contract modification.
1.5 Period of Performance
The period of performance shall be for a twelve (12) month base period, four (4) twelve month option periods, and FAR 52.217-8, Option to Extend Services, up to additional six (6) months. Period of Performance start date in accordance with the solicitation/contract.
1.6 General Information
1.6.1 Quality Control
Quality Control is the responsibility of the contractor. The Contractor is responsible for the delivery of quality services to the Government (see FAR 52.246-4, Inspection of Services – Fixed-Price).
1.6.2 Quality Control Plan
The Contractor shall develop, implement and maintain an effective Quality Control System which includes a written Quality Control Plan (QCP). The QCP shall implement standardized
The beginning of the document. Download the full file to read on.