Home / Temporary Dehumidification System Rental / Document

Request for Quote

Updated

A PDF document (1.2 MB) attached to Temporary Dehumidification System Rental, from the Department of the Navy. Due Nov 16, 2026, 11:00 AM (UTC-5).

File name: N3904026Q3149 Request for Quote.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

THIS IS NOT AN ORDER

PLEASE PROVIDE DELIVERED PRICES, AVAILABILITY, AND PRICE SOURCE WITH

QUOTE

REFERENCE # N3904026Q3149

DUE DATE: 11/16/2026 11:00 AM ET

From: Portsmouth Naval Shipyard
[email protected]
Contracting, Code 410
Kittery, ME 03904

PHONE: 207-651-0355

BUSINESS SIZE (circle one): SMALL

Your company info:
Name:
POC:
(P)
Email:
Cage Code:

LARGE

PRICES DERIVED FROM (CHECK ONE)

___COMMERCIAL PRICE LIST DATED

___INTERNAL PRICE LIST DATED

___OTHER ( PLEASE EXPLAIN )

_X__ If checked, to be awarded on an “All or None” basis, and CPARS evaluation procedures apply.

ITEM

DESCRIPTION

Temporary Dehumidification System Rental. Rental
package may use primary components package or
alternate
components package in accordance with section 3 of
the
Statement of Work. Entire requirement to be
performed in
accordance with the Statement of Work.
0001AA Temporary Dehumidification System package rental. Primary components package parts DH-01 through
DH-04
or;
Alternate components package parts DH-01 through
DH-03.
All to be provided in accordance with the Statement
of
Work .
0001AB
All freight costs associated with SLIN 0001AA. In
accordance with the Statement of Work.

QTY

Unit
Price

0001

0001AC

Temporary Dehumidification System package rental.
Primary components package parts DH-05 through
DH-12

INFO CLIN

52 Weeks

2 Jobs

26 Weeks

Total

REQUEST FOR QUOTATION

N3904026Q3149
or Alternate components package parts DH-04
through DH-13. In accordance with the Statement of
Work
0001AD All freight costs associated with SLIN 0001AC. In accordance with the statement of work.
0002
Preventative Maintenance & Weekly Inspections
In accordance with the Statement of Work
0003
Start Up and Commissioning Equipment
In Accordance with the Statement of Work
0004
See Exhibits: A
Contract Data Requirements List (see Exhibit A)
Data Items:
A01 – Certification Data Report
A02 -Contractor’s Personnel Roster
A03 – Equipment Technical Manual (sanitized)
A04 – Maintenance Support Plan
A05 – Maintenance Service Report
A06 – Hydrostatic Test Report
A07 – Calibration Certificate/Report
A08 - Certification Data Report
A001
Certification Data Report

2 Jobs

52 Weeks

1 Job

INFO ONLY

1 Set

A002

Contractor’s Personnel Roster

1 Set

A003

Equipment Technical Manual (sanitized)

1 Set

A004

Maintenance Support Plan

1 Set

A005

Maintenance Service Report

1 Set

A006

Hydrostatic Test Report

The beginning of the document. Download the full file to read on.

Other documents in this bid