Responses to RFIs - OTA 2 MCI East Barracks

Updated

A PDF document (114 KB) attached to MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a), from the Department of the Navy. Due Oct 29, 2026, 2:00 PM (UTC-4).

File name: Responses to RFIs - OTA 2 MCI East Barracks 26OCT2026.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PPI
No.

Date
Submitted

REFERENCE

Page

Section

10/1/2026

Evaluation
Criteria

10/1/2026
10/1/2026

N/A
N/A

N/A
N/A

Para.

QUESTION

GOVERNMENT RESPONSE

The criterion states that vendors must demonstrate the organizational and operational capability to execute large-scale Industrialized Construction “within the Southwestern United States.” Given that the Award Objective identifies MCI East

3. Vendor

Change "Southwestern" to "Eastern". See Rev 3 AOI N4008526R0276 posted to SAM. locations including Camp Lejeune, MCAS Cherry Point, MCRD Parris Island, and MCB Quantico, please confirm Capability
whether the reference to the “Southwestern United States” is intended to read “Eastern United States” or otherwise applies to the MCI East locations identified in the AOI.
N/A
N/A

Is it the Government's intent to award a single agreement for all 12 buildings Will all of these buildings be awarded at the same time

Determination will be made after RPPs are received
Determination will be made after RPPs are received
Details will be provided during RPP phase.

10/1/2026

N/A

N/A

N/A

After the initial design is accepted, is the intent for all buildings to proceed concurrently, or should they be staggered?

10/1/2026
10/1/2026

N/A
N/A

N/A
N/A

N/A
N/A

What is the anticipated performance period for construction Are these new barracks, or repair by replacement?

10/1/2026

N/A

N/A

10/2/2026

Phase 1 - AOI

10/13/2026

Phase 1 - AOI

Details will be provided during RPP phase.
Projects include demolition and constuction of new barracks In the response to the Phase 1-AOI phase, Evaluation Criteria 3-Vendor Capability, “Vendors should demonstrate a ability to: Obtain bonding for projects of comparable size and complexity, including a brief description of current surety support and approximate per project and aggregate bonding capacity.” The “brief description” does not have N/A
Will 100% performance and payment bonds be required?
to be official documentation from a surety company. Vendors can state their current project and aggregate bonding capacity. Vendors who are selected to proceed to the Phase 2-RPP phase will receive specific bonding requirement submission details.
The AOI states that White Paper submissions remain valid and eligible for consideration for one year from the AO Vendors may be placed in the Portal at two points: (1) After evaluation of White Papers, some vendors who are no White Paper submission due date and that, during this period, a “portaled vendor” may be invited to Phase 2 if an additional