REV RMACC III ATTACHMENT B
Updated
A Word document (39 KB) attached to USCG Regional Multiple Award Construction Contract (RMACC III), from the US Coast Guard. Due Dec 31, 2026, 5:00 PM (UTC-5).
File name: REV RMACC III ATTACHMENT B.docx
The full file is for paid members, or buy this bid alone.
Preview
PROJECT No. (Check one): - 1 - 2 - 3 - 4 - 5
Name of Offeror:
Project Title:
Contract Number:
Description of the Project’s Scope and Magnitude (12-point font):
Describe any problems encountered with this project and corrective action taken. (12-point font) List the firm performing the design, design disciplines used and a brief description of the major design components. Complete this question for Design-Build projects only.
Discipline
Description
Civil
Structural
Mechanical
Electrical
Other
Describe involvement of the designers during the construction phase of the job (12-point font) Complete this question for Design-Build projects only: List the most relevant construction trades involved in the project as well as the firm that provided that trade. Also provide a brief description of jobs performed by each trade.
Trade
Firm
Description
1.
2.
3.
4.
Attach any copies or photographs of industry awards/special recognitions, etc. received for this project (maximum of one page-this is not included in the 4-page maximum for Attachment B). Photo page may be sent separately due to file size restrictions.
The beginning of the document. Download the full file to read on.