RR - Shim Redacted
Updated
A PDF document (129 KB) attached to ACCU Shim, from the Department of the Navy. Due Nov 2, 2026, 4:00 PM (UTC-5).
File name: RR - Shim_Redacted.pdf
The full file is for paid members, or buy this bid alone.
Preview
L/T Rounding Ring Shim Procurement
Project Description: Fabrication of parts described in the task description below. Task Description:
The Contractor shall fabricate parts below
Nomenclature
COMP 2, Type 1, Class 1,
.125’ THK per AMS-DTL22499 8” X 48” Sheet
Part Number
Drawing
BRFLX0800X4800X.125-2
-
Quantity
to Build
Quantity
to Inspect
-
Dimensional Data in addition to drawings:
N/A
Documentation Requirements:
The contractor shall provide the government with inspection reports. Inspection Requirements:
Vendor is responsible to ensure that all drawing and Statement of Work requirements are met. Inspection shall be performed in accordance with inspection criteria that is created and provided by the vendor. No specific format is required, but vendor shall carry through with format for each inspection report. All applicable Certs and C of C’s shall be included in inspection reports. Government has final acceptance or rejection authority of the component aesthetics and dimensional specifications. Technical POC:
POC:
Delivery Requirements:
Quantity of each P/N listed above are due 12 weeks ARO
Accelerated deliveries are acceptable.
Documentation Provided to the Contractor (0 Documents)
Drawing/OD
Quality Acceptance Record
The beginning of the document. Download the full file to read on.