Home / ACCU Shim / Document

RR - Shim Redacted

Updated

A PDF document (129 KB) attached to ACCU Shim, from the Department of the Navy. Due Nov 2, 2026, 4:00 PM (UTC-5).

File name: RR - Shim_Redacted.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

L/T Rounding Ring Shim Procurement
Project Description: Fabrication of parts described in the task description below. Task Description:

The Contractor shall fabricate parts below

Nomenclature
COMP 2, Type 1, Class 1,
.125’ THK per AMS-DTL22499 8” X 48” Sheet

Part Number

Drawing

BRFLX0800X4800X.125-2

-

Quantity
to Build

Quantity
to Inspect
-

Dimensional Data in addition to drawings:
N/A
Documentation Requirements:
The contractor shall provide the government with inspection reports. Inspection Requirements:
Vendor is responsible to ensure that all drawing and Statement of Work requirements are met. Inspection shall be performed in accordance with inspection criteria that is created and provided by the vendor. No specific format is required, but vendor shall carry through with format for each inspection report. All applicable Certs and C of C’s shall be included in inspection reports. Government has final acceptance or rejection authority of the component aesthetics and dimensional specifications. Technical POC:

POC:

Delivery Requirements:
Quantity of each P/N listed above are due 12 weeks ARO
Accelerated deliveries are acceptable.
Documentation Provided to the Contractor (0 Documents)
Drawing/OD

Quality Acceptance Record

The beginning of the document. Download the full file to read on.

Other documents in this bid