DEPARTMENT OF THE AIR FORCE
HEADQUARTERS AIR FORCE TEST CENTER (AFMC)
EDWARDS AIR FORCE BASE CALIFORNIA
REQUEST FOR WHITEPAPERS (RWP)
To: AEDC Velocity Alliance Consortium Performers and Industry Partners via SAM.gov Project Title: ICD-705 Compliant Trailers
Contracting Organization: AFTC/PZIA (Arnold)
Applicable NAICS Code: 541330 – Engineering Services
Applicable PSC Code: 5410 – Prefabricated and Portable Building Acquisition Authority: 10 U.S.C. § 4022 Other Transaction Authority (OTA) Offerors may recommend alternative NAICS and PSC for consideration.
1.0 Introduction and Purpose
The Arnold Engineering Development Complex (AEDC) is seeking innovative whitepapers from members of the AEDC Velocity Alliance Consortium and industry partners via SAM.gov to design, procure, site, install, integrate, and accredit temporary secure working areas (TSWAs).
2.0 Project Scope and Key Objectives
The project's key objectives are organized into structured phases to transition from feasibility and business process validation to physical execution and accreditation. •
•
Design & Feasibility Phase (Base Effort): Performers will conduct a business process validation to define the total physical footprint needed for two (2) OEMs in secure, separated spaces. Performers will demonstrate the feasibility of the proposed configuration, utility routing, and initial TEMPEST compliance strategy, culminating in a complete and approved design package (including fabrication plans and site preparation drawings) that meets Preliminary Design Review (PDR) and Critical Design Review (CDR) expectations. Procurement & Execution Phase (Optional Effort): Upon successful completion and approval of the design, and subject to the availability of funds, the Government may exercise options to procure, deliver, site, install, integrate utilities for, and obtain full accreditation for the trailers/prefabricated facilities.
3.0 Instructions for Performer's Response
3.1 Technical Competency
Performers must submit a Technical Capability Statement within their Whitepaper that details their ability to execute this project. Performers will be evaluated on their demonstrated capability, rather than submitting final designs. The Whitepaper must address the following technical criteria: 1. ICD-705 and TEMPEST Design Expertise: Demonstrated capability to design, construct, and secure accreditation for facilities meeting ICD-705 compliance and full TEMPEST certification standards.
2. Soundproofing Engineering: Demonstrated experience or capability to meet a Sound