SAM.gov Pre Solicitation Notice Trench Digging
Updated
A PDF document (244 KB) attached to Pre-Solicitation Notice - Trenching, Conduit and Ground-well Installation, from the Department of State. Due Oct 26, 2026, 2:00 PM (UTC-5).
File name: PR16330526_SAM.gov Pre Solicitation Notice_Trench Digging.pdf
The full file is for paid members, or buy this bid alone.
Preview
An official website of the United States government Here’s how you know
ISR Workspace: Increased Contract Volume
See All Alerts
Show Details
Jun 26, 2026
Revolutionary FAR Overhaul Impacts to SAM.gov
Show Details
Aug 15, 2025
Home
Search
Data Bank
Data Services
Help
Contract Opportunity
Version
Opportunity
Pre-Award
Solicitation Details
Classification
Description
Contact
Information
Attachments/Links
Interested Vendors
List
Pre-Solicitation Notice
- Trenching, Conduit
and Ground-well
Installation
Draft
Notice ID
PR1633
0526
Related
Notice
(blank)
Contract
Opportunity
Type
Presolic
itation
Contract
Line
Item
Number
(blank)
Inactive
Dates
Response
Date
Nov 10,
2026
Oct 26,
2026
2:00 PM
GMT-5
Inactive
Policy
15 days
after response
date
Published
Date
(blank)
Department/Ind. Agency
STATE, DEPARTMENT OF
Sub-tier
Office
STATE, DEPARTMENT OF
US EMBASSY
KINGSTON
Classification
Original
Set Aside
No Set
aside
used
Product
Service
Code
Place of Performance
(blank)
Initiative
NAICS
Code
(blank)
Recovery and
Reinvestment Act
(blank)
Description
Description
The United Stated Embassy in Kingston,
Jamaica, plans to issue a Request for
Quotations (RFQ) for trenching, conduit and
ground-well installation in various locations
on the Embassy compound.
Scope of Work: The contractor will provide
all labor, equipment, supervision, material
specific to the back filling and compaction
and management needed to complete the
job
Infrastructure Support System Handhole / Underground Conduit System Trenching
Nine locations have been identified requiring trench work.
Thirteen locations have been identified
requiring trench work.
Before excavation, the Contractor shall
locate and verify all existing utilities in
the proposed trench alignment.
If excavation interferes with existing
drains, piping, or structures, the
Contractor shall immediately notify, in
writing, the COR and provide temporary
protection for these systems before
proceeding.
Trenching from Handholes
The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of
conduits entering and exiting each
structure, in accordance with the
drawings.
Conduit
Existing conduit shall remain in place
unless the drawings specifically direct
removal or modification.
Under grass, soil, the Contractor shall
install Schedule 80 PVC conduit with a
The beginning of the document. Download the full file to read on.