Home / Small Business D/B Military Construction MATOC / Document

SBSA DB 240M

Updated

A PDF document (1.7 MB) attached to Small Business D/B Military Construction MATOC, from the Department of the Army. Due Nov 12, 2026, 1:00 PM (UTC-5).

File name: W912QR25R0018 SBSA DB 240M - Final.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SOLICITATION, OFFER,

AND AWARD

1. SOLICITATION NO.

W912QR25R0018

(Construction, Alteration, or Repair)

2. TYPE OF SOLICITATION

SEALED BID

(IFB)

3. DATE ISSUED

PAGE OF PAGES

17-Jul-2025

1 OF

X NEGOTIATED (RFP)

IMPORTANT - The "offer" section on the reverse must be fully com pleted by offeror. 5. REQUISITION/PURCHASE REQUEST NO.

4. CONTRACT NO.

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

W912QR

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

TEL: 502.315.7494

(If Other Than Item 7) CODE

See Item 7

FAX:

9. FOR INFORMATION

CALL:

6. PROJECT NO.

TEL:

FAX:

A. NAME

B. TELEPHONE NO.

JESSICA K MOSS

502.315.6179

(Include area code)

(NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

(Title, identifying no., date):

IDIQ Design Build and Design Bid Build Multiple Aw ard Task Order Contract (MATOC) to support the military construction (MILCON) and operations and maintenance (O&M) funded construction requirements for U.S. Army, U.S. Air Force, Army Reserve and Air Force Reserve in the Louisville District Area of Responsibility.
The available capacity for this MATOC is $240,000,000.00. The maximum ordering limit per task order is $15,000,000.00. Each MATOC aw ard w ill consist of a five year base period and one six-months option to extend the ordering period. NAICS Code 236220. Size Standard $45,000,000.00.
This project is set-aside 100% for Small Business.

aw ard,

X notice to proceed. This performance period is

X mandatory,

negotiable.

FAR 52.211-10
.)

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES

12B. CALENDAR DAYS

NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

01:00 PM
(hour)
Sep
2025
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee

is,

X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference. calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected. NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

SOLICITATION, OFFER, AND AWARD (Continued)

The beginning of the document. Download the full file to read on.

Other documents in this bid