Schedule of Supplies and Services 45667
Updated
A PDF document (162 KB) attached to USCG STA San Francisco (45667) FY27 Dd Repairs, from the US Coast Guard. Due Dec 2, 2026, 2:00 PM (UTC-5).
File name: Schedule of Supplies and Services _ 45667.pdf
The full file is for paid members, or buy this bid alone.
Preview
Schedule of Supplies and Services: USCG STA SAN FRANCISCO (45667) Contract Award: 70Z04026QSBPL0001
The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dry-docking repairs and alterations to the vessel, in accordance with this solicitation and attached specifications. Failure to read the specifications in their entirety will not relieve the quoter from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the quoter’s risk.
To be filled out with a cost associated for each Definite CLIN and Option(s) CLIN with an overall total submitted on an Excel spreadsheet.
CLIN
DESCRIPTION
D-001
D-002
D-003
D-004
D-005
D-006
General Welding, Provide
Ultrasonic Testing (UT) (100) Shots, Perform
Hull Plating (U/W Body), Inspect
Fendering System, Inspect
Accessible Spaces, Inspect
Diesel Fuel Tank, Clean and Inspect
Main Diesel Engine(s) To MEPS Generator(s) And Jet
Drive(s), Align
Water Jet-Inspect, Perform Service
Jet Drive Anodes, Renew
Engine Exhaust Piping, Inspect
Electrical Isolation, Perform MEPS
MDE SW Valves, Overhaul
Sea Valves, Renew
Water Jet Drive, Preserve
U/W Body, Preserve (100%)
Marine Chemist Services, Provide
Drydock
Temporary Services, Provide
Sea Trial Performance, Support, Provide
Lazarette Bilge, Preserve
Sea Strainer (Copper Alloy) , Renew
Mast, Inspect
Main Diesel Engine(s) and Reduction Gear(s), Remove
and Install
Standard Hoses, Renew
Various Piping, Inspect
Diesel Tanks, Refuel
Towline Reel and Towing System Components, Inspect
Tow Reel, remove and Install
Fender Faying Surfaces, Preserve, 100 Percent
Exterior and Interior Non-Skid Pads, Renew
Interior Hull Insulation, Inspect
Interior Hull Insulation, Renew
D-007
D-008
D-009
D-010
D-011
D-012
D-013
D-014
D-015
D-016
D-017
D-018
D-019
D-020
D-021
D-022
D-023
D-024
D-025
D-026
D-027
D-028
D-029
D-030
D-031
D-032
QUANTITY
UNIT
OF
ISSUE
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
UNIT PRICE
TOTAL
O-044
D-045
O-046
Composite Labor Rate
The beginning of the document. Download the full file to read on.