Performance Work Statement / Statement of Work
For Arkabutla Lake Project
WATER PLANT REHAB – SUPPLY & INSTALL
Scope of Work.
Arkabutla Lake Project has previously had a new well installed and now requires the old well to be abandoned and the surrounding small 30 x 50 metal building to be rehabbed to continue to protect the new well. The USACE personnel will perform prep work prior to delivery and install by removing old building where replacement Pre-fabricated building will be delivered and installed.
This location is in a open recreation area that is open to the public at all times. It is not located within a secure area or a personnel only area at Arkabutla Lake Project. The contractor shall provide all labor, tools, equipment, transportation, parts, materials, and other incidentals necessary to provide this complete turn key work within 120 days of award: General Specifications:
Abandon old well
Install new plumbing includes valves to meet AWWA C-509 specs, flange fitting to meet AWWA specs, watts 2” pressure reducer, 2” flange master meter, Stenner model 45MHP10 chemical pump, 3 phase air compressor, accessories and fittings to connect and create a working system
Purchase, deliver, & install one (1) 30’x50’ pre-fabricated metal Red Iron open span building with 12’ tall eaves, 26-gauge roof & walls, one (1) roll up door, one (1) 3’x7’ walk through door, insulation, and gutters. Building will include engineer’s stamped drawings for the building and a set of anchor bolt plans. Sand blast and paint tank with one (1) coat Tnemec-Zinc 3-5ml inside and out. Second coat inside Tnemec series 21 6-9ml. Third coat inside Tnemec series 216-9ml. Second coat outside L140 epoxy 6-9ml. Third coat outside 1094 urethane 5-7ml. Install new electrical including 200-amp enclosed circuit breaker outside (2020 NEC requirement), 200-amp main breaker panel inside, pump control panel with motor starter to control well, disconnect at well, six (6) 8” long LED strip lights, two (2) 55 watt outside lights with photocell, ten (10) 120V outlets including an outside GFCI, 3 phase circuit for air compressor, and reconnect existing pressure controls on tank DELIVERY: ARKABUTLA LAKE PROJECT, MS –contact: Billy Fowler 662-292-1984. 5500
ARKABUTLA DAM ROAD, HERNANDO MS 38632
Freight FOB: Destination. Price includes delivery, off-loading at the designated stockpile location.
Arrangement of Delivery of Service will be made to Arkabutla Lake Field Office at said address within