Section C Scope of Work
Updated
A PDF document (379 KB) attached to General Construction Job Order Contract (JOC), from the Department of the Navy. Due Nov 4, 2026, 2:00 PM (UTC-8).
File name: Section C_Scope of Work.pdf
The full file is for paid members, or buy this bid alone.
Preview
Section C - Descriptions and Specifications
SECTION C
DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1
GENERAL INTENTION
It is the intention of this solicitation to secure general construction work as defined under NAICS 236220 at various Government facilities within the Naval Information Warfare Center Pacific (NIWC Pacific) Area of Responsibility (AOR) by means of awarding an indefinite-quantity contract at pre-determined unit prices and bid price coefficient, effective for a base period of 24-months. The contract also provides for an additional option period of 36-months, for a total contract period of 60-months to be exercised at the discretion of the Government. Delivery or performance periods shall be specified in individual delivery orders issued hereunder. Individual order performance time will be in accordance with Section F, ORDERING OF WORK. C.2
STATEMENT OF WORK (SOW)
1.
PURPOSE
The Job Order Contract (JOC) will provide commercial and institutional construction services for minor new construction, repairs, rehabilitation, alterations, and renovations requiring minimal design. This JOC is intended to provide rapid response for construction, maintenance, rehabilitation and repair of real property in a cost effective manner. Task orders for design only shall not be placed against the contract. However, minimal design services related to construction may be required. Firm-fixed-price task orders for construction will be placed against the contract. The successful offeror must be able perform multiple task orders in multiple locations simultaneously. Work locations include: San Diego Metro area including Naval Base Point Loma (NBPL), ALL other NIWC PAC areas of responsibility., and Naval Base San Diego (NBSD), This JOC will be used as one of many tools for a contracting method available to the Government for the types of construction services as referenced above that may be required by the agency. All task orders issued under this contract will be reviewed and deemed appropriate for this acquisition method. 2.
DESCRIPTION
The successful offeror shall provide, upon receipt of a task order, all labor, materials, supplies, parts (to include system components), plant, supervision, equipment, and related services, (except when specified as Government furnished), for projects including, but not limited to, electrical, mechanical, painting, engineering/design, paving (asphaltic and concrete), flooring (tile work/carpeting), walls (drywall/acoustical), ceiling (drop/hard ceilings),
The beginning of the document. Download the full file to read on.