Home / East Canal Efficiency Improvements / Document

Sol

Updated

A PDF document (290 KB) attached to East Canal Efficiency Improvements, from the Bureau of Reclamation. Due Nov 20, 2026, 1:00 PM (UTC-7).

File name: Sol_140R4026R0025.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

1. SOLICITATION NO.

SEALED BID (IFB) INVITATION FOR BID

140R4026R0025

(Construction, Alteration, or Repair)

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED

PAGE

09/25/2026

OF

PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

0044056295

CODE

7. ISSUED BY

8. ADDRESS OFFER TO

R40
Bureau of Reclamation
Upper Colorado Region
Regional Office
125 South State Street, Room 8100
Salt Lake City UT 84138

9. FOR

INFORMATION CALL

a. NAME

Tyler

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

Spencer

8015243653

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Attachment 1 - Specifications
Attachment 2 - Drawings
The principle components of the East Canal Water Efficiency Improvements include, but are not limited to, the following:

1. Mobilization and Preparation

2. Removing and disposal of existing features

3. Earthwork for concrete structures

4. West Loutzy Diversion Pipeline

a. West Loutzy Diversion Pipeline Concrete Inlet Structure b. West Loutzy Diversion Pipeline Concrete Outlet Structure c. Approximately 4,200 feet of 36-Inch Diameter HDPE pipe and associated fittings

5. East Canal Side Channel Spillway

a. East Canal Side Channel Spillway Concrete Structure
Continued...
11. The contractor shall begin performance within
award,

notice to proceed. This performance period is

calendar days and complete it within
mandatory

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.) YES

NO

calendar days after receiving

negotiable. (See

).

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and
local time

11/20/2026

copies to perform the work required are due at the place specified in Item 8 by

1300

(hour)

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes

containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due. b. An offer guarantee

is,

is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

The beginning of the document. Download the full file to read on.

Other documents in this bid