Sol
Updated
A PDF document (282 KB) attached to GLCA Hite, from the National Park Service. Due Oct 30, 2026, 5:00 PM (UTC-6).
File name: Sol_140P2026R0011.pdf
The full file is for paid members, or buy this bid alone.
Preview
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
1. SOLICITATION NO.
SEALED BID (IFB) INVITATION FOR BID
140P2026R0011
(Construction, Alteration, or Repair)
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED
PAGE
06/17/2026
OF
PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.
CODE
7. ISSUED BY
PDS
NPS, DSC Contracting Services Div
1 Denver Federal Center, Building 50
P.O. Box 25287
Denver CO 80225-0287
9. FOR
INFORMATION CALL
6. PROJECT NO.
0044039145
GLCA 318878
8. ADDRESS OFFER TO
See Section "L" Instructions
a. NAME
Tony
5. REQUISITION/PURCHASE REQUEST NO.
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
Jasper
3039692789
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
GLCA 318878 - Glen Canyon Low Water Ramps - Hite District a) This acquisition is being conducted as a Total Small Business Set-Aside. The North American Industrial Classification System (NAICS) code and the associated small business size standard are noted in clause 52.204-B in section "K" of this solicitation. b) Refer to section "L" for information regarding a pre-proposal site visit. c) Information and requirements stated in sections "B" through "J" & attachments noted in section "J" apply to this solicitation and the subsequent contract. d) Refer to section "L" for proposal submittal requirements. e) Offerors shall submit proposals and questions, and acknowledge solicitation amendments as stated in section "L" of this solicitation.
f) All Physical Data, Reports, and or information has been attached in Section J. g) Notice to Proceed will be issued shortly after contract award, upon receipt of bonds.
11. The contractor shall begin performance within
award,
notice to proceed. This performance period is
calendar days and complete it within
mandatory
calendar days after receiving
negotiable. (See Section H - Special Req 4
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.) YES
NO
).
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
local time
07/15/2026
copies to perform the work required are due at the place specified in Item 8 by
The beginning of the document. Download the full file to read on.
Other documents in this bid
- HITE
- Attachment 1: GLCA 6914 DESIGN BUILD Request for Proposals
- Attachment 4: GLCA 6914 Predesign Material-Hydraulic Tech Memo
- Attachment 5: GLCA 6914 Predesign Material-HydroanalysisModelingReport
- Attachment 9: GLCA Hite-BasisOfDesign
- Attachment 10: GLCA IPM Plan
- Attachment 11: Proposal Submission Package HITE
- Attachment 12: Wage Determination HITE
- GLCA Hite District Q A 0001
- Sol Amendment 0001
- Sol Amendment 0002