Home / NAMA 326209 East Potomac Seawall Design Build / Document

SOL EPP Seawall DB draft 1

Updated

A PDF document (1.1 MB) attached to NAMA 326209 East Potomac Seawall Design Build, from the Departmental Offices.

File name: SOL_140D0427RP001_EPP_Seawall_DB_draft_1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Solicitation

Document No.

Document Title

140D0427RP001

NAMA 326209 East Potomac Seawalls Design
Build

Page |1

SECTION A – SOLICITATION / CONTRACT FORM

(1) Issuing Agency:
Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD)
(2) Requesting Agency:
DOI National Park Service (NPS)
(3) Contract Information:
AQD is a Federal Franchise Fund Contracting Office that operates under the authority of the Government Management Reform Act, as amended. AQD provides contracting support to all Federal Agencies and the Department of Defense. AQD Procurement will handle solicitation, award, contract administration, and invoice payments for this requirement.

NAICS Code:
Product Service Code:
SB Size Standard:

AF
T

This Request for Proposal (RFP) is issued in accordance with the Two-Phase Design-Build Selection Procedures in FAR 36.101-2 and FAR 15, as deviated. This solicitation is unrestricted.
237990 – Other Heavy and Civil Engineering Construction Y1PZ – Construction of Other Non-Building Facilities
$45M

R

SECTION B – PRICE SCHEDULE

This section is only applicable to offerors in Phase 2.

D

The anticipated Contract Line-Item Number (CLIN) structure is in the table below. This may change based on actual pricing proposal. Reference section L for the instructions and requirements for the submission of the detailed price proposal. The total firm-fixed price for this project is: $___

CLIN

0001
0002
0003

Description
Design (CD & DD)
Construction of Z-Panel Wall
Construction Stamped Concrete Wall
Total

Total Price

SECTION C – SPECIFICATIONS / DRAWINGS

This requirement is for the design and construction to rehabilitee approximately 20,700 linear feet of shoreline and seawall infrastructure at East Potomac Park (EPP or Park). The project area includes the shoreline along both the Potomac River and Washington Channel and encompasses associated improvements required to provide long-term shoreline protection, improve drainage performance, preserve public access and protect Park resources.

Solicitation

Document No.

Document Title

140D0427RP001

NAMA 326209 East Potomac Seawalls Design
Build

Page |2

Please see Attachment A – NAMA 326209_ EPP POR_09-30-26_Final for all specifications and drawings.
NOTE: Please ignore any language in the Program of Requirements (POR) that pertains to living shorelines. There will be no living shorelines as part of this project. The extent of the use of the Z-panel wall and the stamped concrete wall are outlined below:

The beginning of the document. Download the full file to read on.