Solicitation
Updated
A PDF document (576 KB) attached to Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, Florida, from the Department of the Air Force. Due Nov 23, 2026, 12:00 PM (UTC-5).
File name: Solicitation - FA664827R0001.pdf
The full file is for paid members, or buy this bid alone.
Preview
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION
NUMBER
FA664827R0001
2. TYPE OF SOLICITATION
3. DATE ISSUED
SEALED BID (IFB) INVITATION
FOR BID
NEGOTIATED (RFP) REQUEST
FOR PROPOSAL
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
7. ISSUED BY
CODE:
FA6648
8. ADDRESS OFFER TO
FA6648 482 LSS LGC
ADMINISTRATIVE ONLY NO REQUISITIONS, 29050 CORAL SEA BLVD
HOMESTEAD AFB, FL 33039-1299
UNITED STATES
FA6648 482 LSS LGC
29050 CORAL SEA BLVD, ADMINISTRATIVE ONLY NO REQUISITIONS
HOMESTEAD AFB, FL 33039-1299
UNITED STATES
TAHJ GUILFORD, Email: [email protected] Telephone: 7864153645 TAHJ GUILFORD, Email: [email protected] Telephone: 7864153645
9. FOR
INFORMATION
CALL:
6. PROJECT NUMBER
KYJM 25-9010
b. TELEPHONE NUMBER (include area code) (NO COLLECT CALLS) 7864153645
a. NAME
TAHJ GUILFORD
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10.THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) Project Title: Design-Build Renovation of Building 164
Project Location: Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, Florida The contractor shall provide all labor, materials, equipment, supervision, transportation, permits, and incidental services necessary to renovate the Outdoor Recreation facility in Building 164 at Homestead Air Reserve Base, Florida IAW the SOW.
Work includes selective demolition; interior renovation; roof insulation and ventilation improvements; replacement of deteriorated overhead garage doors; exterior door and window improvements; masonry, concrete, façade, and weather-protection work; accessibility improvements; and associated mechanical, electrical, plumbing, finishes, and site restoration work. The contractor shall perform all work in accordance with the solicitation drawings, specifications, wage determination, and contract terms and conditions. The project supports the Outdoor Recreation program’s equipment rental, storage, showroom, office, and customer-service functions
11. The contractor shall begin performance within 10 calendar days and complete it within 360 calendar days after receiving award,
notice to proceed. This performance period is
mandatory
negotiable. (See FAR 52.211-10 ).
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
The beginning of the document. Download the full file to read on.