Solicitation Attachment I - Performance Work Statement
Updated
A Word document (45 KB) attached to Sole Source OEM Boat Davit Tech Rep, from the Department of the Navy. Due Dec 7, 2026, 11:00 AM (UTC-8).
File name: Solicitation Attachment I - PWS.docx
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE OF WORK STATEMENT
.
1. SPECIFICATION:
This requirement supports a US Naval Vessel and requires authorized Original Equipment Manufacturer (OEM) Technical Representative(s) to provide post-repair technical assistance, assessment, and testing oversight for the Port and Starboard Boat Davit Assemblies. The OEM Technical Representative shall conduct visual and operational assessments, review repairs completed by Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) and any issues encountered during those repairs, provide over-the-shoulder guidance to SRF-JRMC and Ship's Force (SF) personnel during troubleshooting, and provide OEM reach-back support for materials determined to be necessary to return the davits to a fully operational status. The Contractor shall provide a detailed assessment report identifying discrepancies, recommended corrective actions, and material information for engineering adjudication of conditions beyond Government repair capability. The Contractor shall furnish any proprietary special tools or equipment required to perform the contracted assessment, testing support, and troubleshooting assistance. Following the assessment or testing, the Contractor shall identify the nomenclature, OEM part number, quantity, price, availability, and lead time for any required parts necessary to return the davits to a fully operational status. The Contractor shall not order or ship material that will result in additional cost to the Government without a contract modification issued by the Contracting Officer. Once authorized, the Contractor shall expedite procurement and shipment to the site. The OEM Technical Representative shall be onsite to observe required testing and certification after the Government determines that the davits are ready for testing.
2. REFERENCES:
Environmental requirements U.S. Navy Rules and Regulation (NAVSHIPREPFACINST 5090.1J and CFASINST 4100.1F) S9583-BQ-MMC-010 Tech Manual PLR-3250 - 10APR2003
S9583-CP-MMA-010 Tech Manual PLR-3600 - 01JUL2010
S9583-BZ-MMC-010 Tech Manual PLR-3250 - 31DEC2010
S9583-BV-MMA-010 Tech Manual PLR 3250 - 30JAN2020
Test Procedure No. 58311-3-708KTR BOAT DAVIT (P) (OP & LOAD TEST) - BI-ANNUAL
3. ENCLOSURES:
Sample Support Service Request (SSR)
Space Control Signs IAW NAVSEAINST 9210.48
4. GENERAL SCOPE OF WORK:
The Contractor shall provide post-repair technical assistance, assessment, testing oversight, troubleshooting support, and OEM reach-back support for materials associated with the Port VestDavit model PLR-3600 Davit Assembly and Starboard VestDavit model PLR-3250 Davit Assembly onboard a US Naval Vessel. The Boat Davit Assemblies include, but are not limited to, the hook, wire rope, electrical controls, davit arm, Hydraulic Power Unit (HPU), control stand, Manual Control Console (MCC), winch, flexible hoses, piping, and foundation.
The beginning of the document. Download the full file to read on.