Sources Sought 10 26 2026 1
Updated
A PDF document (173 KB) attached to ID- Kooskia Nfh-Overhead Door Replace, from the Departmental Offices. Due Nov 6, 2026, 5:00 PM (UTC-8).
File name: A14_Sources_Sought_10_26_2026_1.pdf
The full file is for paid members, or buy this bid alone.
Preview
This is a SOURCES SOUGHT SYNOPSIS and is for informational / market research purposes only.
THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A
PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2.
No reimbursement will be made for any costs associated with providing information in response to this synopsis or on any follow-up information.
NO SOLICITATION IS CURRENTLY AVAILABLE.
The purpose for this synopsis is to conduct market research to help identify capable, potential sources and to establish if this requirement can be set-aside for small business or other socioeconomic programs to include: Small Business, 8(a) firms, Historically Underutilized Business Zones (HUBZone), WomenOwned Small Business (WOSB), Economically Disadvantaged Women-Owned Small Business (EDWOSB) and Service-Disabled Veteran Owned Small Business (SDVOSB). Those programs are highly encouraged to respond.
The synopsis and solicitation, if issued, will be made available on https://www.SAM.gov. It is the potential offerors responsibility to monitor https://www.SAM.gov/opportunities for issuance of any future solicitation that may result from this Sources Sought Synopsis. The estimated posting date of the solicitation will be on or about 11/06/2026.
NAICS Code: 238290
Small Business Size Standard: $22.0 Million
Product and Service Code (PSC): Z 1 A A
The resulting solicitation and contract will be Firm-Fixed-Price (FFP).
GENERAL INFORMATION:
The U.S. Fish and Wildlife Service (USFWS) Contracting Office Background: Kooskia National Fish Hatchery, Kooskia, Idaho, Idaho County, requirement is for replacement of three roll-up garage doors, and 2 additional electric door operators shall also be installed.
THE WORK CONSISTS OF:
The contractor shall provide all labor, materials, equipment, and supervision necessary to remove three existing roll-up garage doors and install three new sectional overhead doors. Work includes removal, disposal, installation, adjustments, testing, and site cleanup. Two additional electric door operators shall also be installed as described in the Statement of Work (SOW). Installation Requirement to be met:
•
Contractor must verify all field measurements and conditions before ordering materials.
•
All pad surfaces must be flush with jambs.
•
Contractor is responsible for the removal and disposal of old doors and debris.
•
All installation must comply with applicable codes and standards.
The period of performance for the project is 60 days from Notice to proceed.
The beginning of the document. Download the full file to read on.