W912P8-27-SS-0001
SOURCES SOUGHT FOR
CALCAISEU RIVER SALTWATER BARRIER FRP TAINTER GATE
INTRODUCTION
The US Army Corps of Engineers, New Orleans District, Contracting Division is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support the requirement for the Calcaiseu River Saltwater Barrier FRP Tainter Gate. The intention is to procure this on a competitive basis
BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET
RESEARCH, THIS REQUIREMENT MAY BE SET-ASIDE FOR SMALL BUSINESSES
(IN FULL OR IN PART) OR PROCURED THROUGH FULL AND OPEN
COMPETITION. All Small Business Set-Aside categories will be considered. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions.
DISCLAIMER
“THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS
IS NOT A “REQUEST FOR PROPOSAL (RFP)” TO BE SUBMITTED. IT DOES
NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A
COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE
NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO
AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS
ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS
ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO
THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. RESPPONSES
WILL NOT BE RETURNED TO THE RESPONDER. NOT RESPONDING TO
THIS NOTICE DOES NOT PRECLUDE PARTICIPATION IN ANY FUTURE
REQUEST FOR QUOTE (RFQ) OR INVITATION FOR BID (IFB) OR RFP, IF
ANY ISSUED. IF A SOLICITATION IS RELEASED, IT WILL BE SYNOPSIZED
ON THE GOVERNMENT-WIDE POINT OF ENTRY (GPE). IT IS THE
RESPONSIBILITY OF POTENTIAL OFFERORS TO MONITOR THE GPE FOR
ADDITIONAL INFORMMATION PERTAINING TO THIS REQUIREMENT.”
REQUIRED CAPABILITIES
The work consists of the design, fabrication, and delivery of five (5) replacement fiber reinforced polymer (FRP) Tainter Gates at the Calcasieu River Saltwater Barrier Structure. The base bid is to include design, fabrication, and delivery of two (2) gates
W912P8-27-SS-0001
with an option bid for the remaining three (3) gates. The new FRP Tainter Gates require full integration into the existing structure which include interchangeable installation and operation to the steel gates. This will include but not be limited to the bolted connection to the structure, seal locations, machinery lifting connections, similar range of weight and center of gravity, and specific installation requirements. The