Sources Sought: Neopit Dam Remediation Construction, Menominee Indian Reservation, Wisconsin This Sources Sought Notice is for informational and planning purposes only and shall not be construed as a solicitation, an obligation, or commitment by the Bureau of Indian Affairs (BIA). Sources Sought Notice Number: DOIASAM270004
This notice is intended strictly for market research to determine the availability of Indian Small Businesses Economic Enterprise (ISBEE), Indian Economic Enterprises (IEE), or Other Small Businesses. Your responses to the information requested will assist the Government in determining the appropriate acquisition method, including whether a set-aside is possible. The anticipated applicable NAICS code for this acquisition is 237990, Other Heavy and Civil Engineering Construction, other relevant NAICS codes will be considered based on responses received.
1.0
BACKGROUND
Neopit Dam was likely constructed in the 1800s and is located on the West Branch of the Wolf River within the Menominee Reservation in the community of Neopit, Wisconsin (Latitude [Lat]:44.981118°N, Longitude [Long]: 88.829152°W), about 12 miles northwest of Keshena, Wisconsin. It is located within Section 20 of Township 29 North, Range 14 East, Menominee County, Wisconsin. The existing dam reservoir supports active operations at the Menominee Tribal Enterprises (MTE) Lumber Mill and is also used for recreation and fishing. The existing storage is 840 acre-feet (AF) at a normal pool elevation (El.) of 1050.50. Neopit Dam is classified as a high-hazard potential dam due to the probable loss of life that would be associated with a failure of the Dam. The Comprehensive Dam Review (CDR) performed in 2012 noted significant performance issues related to the inability to pass the inflow design flood (IDF), the potential for seepage related to buried conduits or intake structures within the existing embankment dam, inadequate upstream slope protection to prevent erosion proximate to the existing spillway, and a high probability of overtopping along the right abutment resulting in contact erosion between the right abutment, embankment dam, and appurtenant structures. Additionally, there is limited knowledge relating to construction of Neopit Dam. For example, there may also be deficiencies related to the following components: foundation treatment, filter zone, drainage blanket/toe drain, compaction, core material, and foundation. 2.0
SCOPE
The proposed Neopit Dam will primarily be comprised of the spillway, outlet works, stilling basin, and