BOCA CHITA KEY

PMIS No. 349620

SHORELINE RECLAMATION + STABILIZATION

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE (NPS)

SOUTHEAST REGION

July 10, 2026

Digitally signed
by Vitaly Feygin
Vitaly Feygin Date:
2026.07.09
16:50:14-04'00'

BOCA CHITA SEASHORE RECLAMATION + STABILIZATION

BISCAYNE NATIONAL PARK (BISC) 349620

Table of Contents (TOC)
Division 01 – General Requirements

01 11 00

Summary of Work

01 26 01

Contract Modification Procedures

01 27 00

Definition of Contract Line Items

01 31 00

Project Management and Coordination

01 32 16

Construction Schedule

01 32 33

Photographic Documentation

01 33 23

Submittal Procedures

01 35 13.22 Archaeological Protection

01 35 23

Safety Requirements

01 40 00

Quality Requirements

01 42 00

Reference Standards

01 50 00

Temporary Facilities and Controls

01 55 00

Site Access and Marine Operations
01 57 19.12 Noise and Acoustics Management

01 57 23

Temporary Storm Water Pollution Prevention (SWPP), Under-an-Acre Pollution Prevention (UPP)

01 67 00

Product Requirements

01 73 40

Execution

01 74 19

Construction Waste Management and Disposal

01 77 00

Closeout Procedures

01 78 23

Operation and Maintenance (O&M) Data
Division 31 – Earthwork

31 00 00

Earthwork

31 25 00

Erosion and Sedimentation Controls

31 32 19.23 Geotextile Layer Separation

31 37 00

Rock Revetment
Division 32 – Exterior Improvements

32 93 00

Plants
Supporting Documents
Submittal List Template (01 33 23)
Closeout and Operation & Maintenance (O&M) Requirements Template & Sample (01 77 00, 01 78 23, 01 79 00) Project Waste Management Plan Worksheet Sample (01 74 19) Appendices
None

BISC 349620

BOCA CHITA KEY SHORELINE RECLAMATION + STABILIZATION

BISCAYNE NATIONAL PARK (BISC) 349620

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1

SUMMARY

A.

Section includes the following:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

1.2

Work Covered by Contract Documents
Work Phases
Work Under Other Contracts
Government-Furnished Materials
Construction Contractor Use of Site
Public Use of Site
Occupancy Requirements for Buildings
Conduct of Operations
Work Restrictions
Special Construction Requirements
Soils Investigation Report
Additional Reports

WORK COVERED BY CONTRACT DOCUMENTS

A.

Project Location:
Biscayne National Park, Boca Chita Key

B.

The work consists of:
1.
The scope includes shoreline stabilization of the northeast corner of Boca Chita Key. The shoreline at Boca Chita Key has experienced shoreline erosion due to hurricanes/storms

The beginning of the document. Download the full file to read on.