West Point “GYM-A” Shirt Specifications
The contractor is to provide the Standard Army uniform item, GYM-A Black Shirt, short sleeve.
The crest shall be an Army Gold (same Gold as used on the ARMY logo on the standard GYM-A shirts) only with the image shown below.
This Space Intentionally Left Blank
The photos below are for reference only to demonstrate placement and alignment.
USMA CREST POSITIONING
1. The Contractor shall position the USMA Crest on the upper left front of the shirt. 2. The crest shall be centered from left to right on the vertical line from the point at which the shoulder seam meets the collar, parallel to the sides of the shirt to the bottom edge of the shirt.
3. The top of the crest shall be 9 inches (+/- 1/8” ) below the shoulder seam - collar seam intersection.
NAME PRINTING
The Contractor shall:
1. Print the last name only,
2. Center and print the name 0.5” above the United States Military Academy (USMA) crest, 3. Use block letters 3/8” thick and 0.5” high.
4. Use the color gold with the same characteristics as the USMA crest. PLEBE CLASS Shirt Requirement
1. The Government will provide the Contractor with an alphabetical list of cadet names with associated sizes on or about the 1st of May per base or option year. The Contractor shall print the provided names and aforementioned crest on six (6) short sleeve shirts and three (3) long sleeve shirts for each cadet.
2. The Government reserves the right to provide the names and sizes to the contractor in either one or two separate batches. There shall not be more than two batches provided to the contractor.
3. The required delivery date for the shirts is not later than 60 calendar days from the date the names are provided to the contractor. Should two batches of information be provided to the contractor, each batch has a required delivery date of 60 days from the date the batch information was provided to the contractor.
4. The government estimates between 1200 to 1300 cadet names and associated sizes 5. The government reserves the right to increase the order by not more than ten percent (10%) of the anticipated annual requirement and shall pay the same rate per shirt as the base requirement.
PACKAGING
The Contractor shall:
1. Pack shirts with quantities requested with the same size and number per plastic bag 2. Bundle S/S shirts with names in packages of 6(six) for each cadet. Pack the bags so that the name and bundle clearly marked with size of shirt.
3. Bundle L/S shirts in packages of 3(three) for each cadet. Pack the bags so that the name