PROJECT SPECIFICATIONS
GENERAL CONSTRUCTION
100% CONSTRUCTION DOCUMENTS
VA MONTROSE MEDICAL
CENTER
FIRE ALARM SYSTEM
REPLACEMENT AND UPGRADE
VA PROJECT NO. 620-22-110
Professional Seal
Fellenzer Engineering, LLP
22 Mulberry Street
Middletown, NY 10940
(845) 343-1481
FE Project No. 22-377
July 21, 2026
VA MONTROSE
FIRE ALARM SYSTEM REPLACEMENT AND UPGRADE
VA PROJECT #620-22-110
06-01-24
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
DIVISION AND SECTION TITLES
DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15
List of Drawing Sheets
05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 32 00
01 32 16.15
01 33 23
01 33 50
01 35 26
01 42 19
01 45 00
01 57 19
01 74 19
General Requirements
Construction Documentation
Project Schedules (Small Projects – Design/Bid/Build
Shop Drawings, Product Data, and Samples
Computer Aided Design Coordination Drawings
Safety Requirements for Major Projects
Reference Standards
Quality Control
Temporary Environmental Controls
Construction Waste Management
11-21
09-23
01-24
11-23
06-23
05-24
11-20
02-21
01-21
04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00
02 83 33.13
Demolition
Lead-Based Paint Removal and Disposal
08-17
01-21
DIVISION 03 – CONCRETE – NOT USED
DIVISION 04 – MASONRY – NOT USED
DIVISION 05 – METALS – NOT USED
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES – NOT USED
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00
07 92 00
Firestopping
Joint Sealants
01-21
04-22
DIVISION 08 – OPENINGS – NOT USED
00 01 10-1
VA MONTROSE
FIRE ALARM SYSTEM REPLACEMENT AND UPGRADE
VA PROJECT #620-22-110
06-01-24
SECTION NO
DIVISION AND SECTION TITLES
DATE
DIVISION 09 – FINISHES
09 91 00
Painting
01-21
DIVISION 10 – SPECIALTIES – NOT USED
DIVISION 11 – EQUIPMENT – NOT USED
DIVISION 12 – FURNISHINGS – NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41
Seismic Restraint Requirements for Non-Structural
Components
01-21
DIVISION 14– CONVEYING EQUIPMENT – NOT USED
DIVISION 21- FIRE SUPPRESSION – NOT USED
DIVISION 22 – PLUMBING – NOT USED
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC) – NOT USED
DIVISION 25 – INTEGRATED AUTOMATION – NOT USED
DIVISION 26 – ELECTRICAL
26 05 11
26 05 19
26 05 26
26 05 33
26 28 16
Requirements for Electrical Installations
Low-Voltage Electrical Power Conductors and Cables
Grounding and Bonding for Electrical Systems
Raceway and Boxes for Electrical Systems
Circuit Breakers
11-22
11-22
11-22
11-22
11-22
DIVISION 27 – COMMUNICATIONS – NOT USED
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY