DEPARTMENT OF VETERANS AFFAIRS
VA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
DIVISION AND SECTION TITLES
DATE
General Requirements
Project Schedules (Small Projects – Design/Bid/Build)
Shop Drawings, Product Data, and Samples
Safety Requirements for Major Projects
Quality Control
Construction Waste Management
06-2026
09-2026
05-2022
06-2019
05-2024
11-2020
02 41 00
DIVISION 02 – EXISTING CONDITIONS
Demolition
01-2021
04 05 16
DIVISION 04 – MASONRY
Masonry Grouting
01-2021
08 14 00
08 31 13
DIVISION 08 - OPENINGS
Interior Wood Doors
Access Doors and Frames
01 00 00
01 32 16.15
01 33 23
01 35 26
01 45 00
01 74 19
09 91 00
DIVISION 01 - GENERAL REQUIREMENTS
DIVISION 09 – FINISHES
01-2021
Painting
01-2021
22 05 11
22 11 00
DIVISION 22 – PLUMBING
Common Work Results for Plumbing
Facility Water Distribution
01-2021
06-2025
26 05 11
26 27 26
26 51 00
DIVISION 26 – ELECTRICAL
Requirements for Electrical Installations
Wiring Devices
Interior Lighting
09-2026
03-2024
03-2023
00 01 10-1
06-01-2026
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1
SAFETY REQUIREMENTS
A. Refer
to section 01 35 26, SAFETY REQUIREMENTS for safety
and infection control requirements.
1.2
GENERAL INTENTION
A. Contractor
shall completely prepare site for building
operations, including demolition and removal of existing structures, and furnish labor and materials and perform
work for project 459-27-004 Renovate Mod 2 at Building 30 as required by drawings and specifications.
B. Visits
to the site by Bidders may be made only by
C. Before
placement and installation of work subject to tests
appointment with the Contracting Officer.
by testing laboratory retained by Department of Veterans
Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of
specimens and field inspection. Such prior notice shall be
not less than three workdays unless otherwise designated by the COR.
D. All
employees of general contractor and subcontractors
shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
01 00 00 -1
06-01-2026
1.3 SPECIFICATIONS
A. Drawings
AND DRAWINGS FOR CONTRACTOR
and contract documents may be obtained from the
website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.4
CONSTRUCTION SECURITY REQUIREMENTS
A. Security
1. The
Plan:
security plan defines both physical and