Home / Project: 459-27-004 ACC MOD 2 Renovation / Document

Specifications Combine

Updated

A PDF document (1011 KB) attached to Project: 459-27-004 ACC MOD 2 Renovation, from the Department of Veterans Affairs. Due Nov 20, 2026, 3:00 PM (UTC-8).

File name: SPECS Combine.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

10-01-2026

DEPARTMENT OF VETERANS AFFAIRS

VA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DATE

General Requirements
Project Schedules (Small Projects – Design/Bid/Build)
Shop Drawings, Product Data, and Samples
Safety Requirements for Major Projects
Quality Control
Construction Waste Management

06-2026
09-2026
05-2022
06-2019
05-2024
11-2020

02 41 00

DIVISION 02 – EXISTING CONDITIONS

Demolition

01-2021

04 05 16

DIVISION 04 – MASONRY

Masonry Grouting

01-2021

08 14 00

08 31 13

DIVISION 08 - OPENINGS

Interior Wood Doors
Access Doors and Frames

01 00 00

01 32 16.15

01 33 23

01 35 26

01 45 00

01 74 19

09 91 00

DIVISION 01 - GENERAL REQUIREMENTS

DIVISION 09 – FINISHES

01-2021

Painting

01-2021

22 05 11

22 11 00

DIVISION 22 – PLUMBING

Common Work Results for Plumbing
Facility Water Distribution

01-2021
06-2025

26 05 11

26 27 26

26 51 00

DIVISION 26 – ELECTRICAL

Requirements for Electrical Installations
Wiring Devices
Interior Lighting

09-2026
03-2024
03-2023

00 01 10-1

06-01-2026

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1

SAFETY REQUIREMENTS

A. Refer

to section 01 35 26, SAFETY REQUIREMENTS for safety

and infection control requirements.

1.2

GENERAL INTENTION

A. Contractor

shall completely prepare site for building

operations, including demolition and removal of existing structures, and furnish labor and materials and perform

work for project 459-27-004 Renovate Mod 2 at Building 30 as required by drawings and specifications.

B. Visits

to the site by Bidders may be made only by

C. Before

placement and installation of work subject to tests

appointment with the Contracting Officer.

by testing laboratory retained by Department of Veterans

Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of

specimens and field inspection. Such prior notice shall be

not less than three workdays unless otherwise designated by the COR.

D. All

employees of general contractor and subcontractors

shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

01 00 00 -1

06-01-2026

1.3 SPECIFICATIONS

A. Drawings

AND DRAWINGS FOR CONTRACTOR

and contract documents may be obtained from the

website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.4

CONSTRUCTION SECURITY REQUIREMENTS

A. Security

1. The

Plan:

security plan defines both physical and

The beginning of the document. Download the full file to read on.

Other documents in this bid