Project No. 658-23-108
100% Final Design
Correct Storm Water Drainage
February 10, 2026
Salem VAMC
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
00 01 15
DIVISION AND SECTION TITLES
DIVISION 00 - SPECIAL SECTIONS
List of Drawing Sheets
DATE
05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 32 16.15
01 33 23
01 35 26
01 42 19
01 45 00
01 45 29
01 57 19
01 74 19
General Requirements
Project Schedules (Small Projects – Design/Bid/Build)
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Testing Laboratory Services
Temporary Environmental Controls
Construction Waste Management
11-21
01-24
11-23
05-24
11-20
02-21
11-18
01-21
04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00
02 82 13.31
Demolition
Asbestos Transite Abatement
08-17
01-21
DIVISION 31 – EARTHWORK
31 20 11
31 23 19
31 23 23.33
Earthwork (Short Form)
Dewatering
Flowable Fill
10-12
10-12
10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23
32 12 16
32 17 23
32 90 00
Cement and Concrete for Exterior Improvements
Asphalt Paving
Pavement Markings
Planting
08-16
09-15
08-16
07-16
DIVISION 33 – UTILITIES
33 10 00
33 40 00
Water Utilities
Storm Sewer
03-17
12-17
00 01 10-1
Project No. 658-23-108
100% Final Design
Correct Storm Water Drainage
February 10, 2026
Salem VAMC
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations,
including demolition and removal of existing structures, and furnish labor and materials and perform work for the Salem VA Medical Center Campus stormwater improvements as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center Contracting Officer Representative (COR).
C. Offices of Mabbett & Associates, Inc., located at 105 Central Street, Suite 4100, Stoneham, MA 02180, as Engineers, will render certain technical services during construction. Such services shall be
considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory