A PDF document (1.3 MB) attached to 537-24-106 Create Contractor Lie-Down Zone, from the Department of Veterans Affairs. Due Nov 20, 2026, 10:00 AM (UTC-6).

File name: S02 - Specifications.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Project No. 537-24-106
Create a Contractor
Lay-Down Zone
06-09-2026

Jesse Brown VA Medical Center
Chicago, Illinois

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

01 00 00

01 32 16.15

01 33 23

01 35 26

01 45 29

01 57 19

01 58 16

01 74 19

DIVISION AND SECTION TITLES

DATE

General Requirements
Project Schedules (Small Projects –
Design/Bid/Build
Shop Drawings, Product Data, and Samples
Safety Requirements
Testing Laboratory Services
Temporary Environmental Controls
Temporary Interior Signage
Construction Waste Management

01-26
12-25

DIVISION 01 - GENERAL REQUIREMENTS

01-26
05-24
11-18
01-21
07-15
04-22

DIVISION 02 – EXISTING CONDITIONS

02 21 13

02 41 00

Site Surveys
Demolition

12-23
08-17

DIVISION 03 – CONCRETE (NOT USED)

DIVISION 04 – MASONRY (NOT USED)

DIVISION 05 – METALS (NOT USED)

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES (NOT

USED)

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 81 00

07 84 00

Apply Fireproofing
Firestopping

07-23
01-21

DIVISION 08 - OPENINGS

08 71 00

Door Hardware

03-24

DIVISION 09 – FINISHES (NOT USED)

DIVISION 10 – SPECIALTIES (NOT USED)

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)

00 01 10 - 1

Project No. 537-24-106
Create a Contractor
Lay-Down Zone
06-09-2026

Jesse Brown VA Medical Center
Chicago, Illinois

SECTION NO

DIVISION AND SECTION TITLES

DIVISION 14– CONVEYING EQUIPEMENT (NOT USED)

DATE

DIVISION 21- FIRE SUPPRESSION (NOT USED)

DIVISION 22 – PLUMBING (NOT USED)

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC) (NOT USED)

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL

26 05 11

26 05 19

26 05 26

26 05 33

26 05 73

26 08 00

26 09 23

26 22 00

26 24 13

26 24 16

26 27 26

26 29 21

26 43 13

26 56 00

Requirements for Electrical Installations
Low-Voltage Electrical Power Conductors and Cables
Grounding and Bonding for Electrical Systems
Raceway and Boxes for Electrical Systems
Overcurrent Protective Device Coordination Study
Commissioning of Electrical Systems
Lighting Controls
Low-Voltage Transformers
Distribution Switchboards
Panelboards
Wiring Devices
Enclosed Switches and Circuit Breakers
Surge Protective Devices
Exterior Lighting

11-22
11-22
11-22
11-22
11-22
11-22
11-22
11-22
11-22
11-22
11-22
11-22
11-22
11-22

DIVISION 27 – COMMUNICATIONS (NOT USED)

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 23 00

The beginning of the document. Download the full file to read on.

Other documents in this bid