JESSE BROWN MEDICAL CENTER
CONSTRUCTION OF A CONTRACTOR LAYDOWN
AREA AND SECURITY UPGRADES
Statement of Work
US Department of Veterans Affairs
Jesse Brown Medical Center
820 S. Damen Ave
Chicago, IL 60612
STATEMENT OF WORK
Prepared by:
Facility Management Division
Date:
7/10/2026
CONSTRUCTION STATEMENT OF WORK FOR
Project Name:
Create a Contractor Lie-Down Zone
Project Number:
537-24-106
Place of Performance: Building 1A, Eastern Exterior Grounds. Jesse Brown VA Medical Center
820 S. Damen Ave
Chicago IL 60612
Part 1: Project Scope of Work Overview
•
•
•
•
•
•
Prepare the ground in the designated zone.
Extend Electric Power to designated Containers’ locations. Place Containers in designated locations.
Fence and gate the designated zone.
Ramp the curb to give easy access to vehicles entering/exiting the zone. Install Cameras and systems for area security.
Part 2: Period of Performance (POP) and Project Construction Cost Magnitude Complete all work including submittals and quality control reviews within the calendar days from Notice to Proceed (NTP) as shown below.
537-24-106 Construction Period of Performance (PoP)
Level Complete
Calendar
Days for
the Work
VA
Review
Total
days
after
NTP
Task 1 – Project Kick-off submittals
Task 2 – Coordination
Task 3 – Pre-Construction submittals
Task 4 – Mobilizations and Performance of
Work
Task 5 – Closeout Submittals
Part 3: Detailed Project Scope of Work
GENERAL PROJECT GOALS
The goal of this project is to create a “Lie-Down” Zone for temporary construction/utility activities.
The Contractor/Builder is required to:
1. Design and Provide all Permits, Plans, Tools, Materials, Components, Labor, and Supervision for Creating a Contractor Lie-Down Zone.
2. Earthwork:
a. Scan and mark all underground utilities within the designated plot. b. Clear the designated plot of trees, roots, and any large debris that may obstruct the scope of work. Properly dispose of all waste materials. Refer to Exhibit B – Site Pictures.
c. A licensed Geotechnical Engineer (hired by the General Contractor) shall assess the soil type and make recommendations of what footings to use. d. Excavate and dispose of soil to the depth specified by the licensed Geotechnical Engineer to ensure proper drainage and achieve the required bearing pressure rating.
e. Compact the ground, install a weed barrier fabric, and fill to level with heavyduty gravel. Utilize a heavy-duty gravel grid and sand as specified. The final