Specifications Draft
Updated
A PDF document (8.5 MB) attached to FY27 NRM - Correct Mather Loop Road and Install Speed Bumps, from the Department of Veterans Affairs. Due Dec 16, 2026, 12:00 PM (UTC-8).
File name: Specifications_DRAFT.pdf
The full file is for paid members, or buy this bid alone.
Preview
612A4-27-004 Correct Mather Loop
Road and Install Speed Bumps
09-22-26
DEPARTMENT OF VETERANS AFFAIRS
Section 00 01 10
SECTION NO
DIVISION AND SECTION TITLES
DATE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 33 23
01 35 26
01 45 29
01 57 19
General Requirements
Shop Drawings, Product Data, and Samples
Safety Requirements
Testing Laboratory Services
Temporary Environmental Controls
DIVISION 02
02 21 13
02 41 00
03 30 53
EXISTING CONDITIONS
Site Survey
Demolition
DIVISION 03
09-26
09-26
CONCRETE
Cast-In-Place Concrete
DIVISION 05
09-26
11-23
08-26
09-26
01-21
09-26
METALS
05 50 00
Metal Fabrications
09-26
07 92 00
DIVISION 07
THERMAL AND MOISTURE PROTECTION
Joint sealants
09-26
DIVISION 10
10 14 00
Signage
DIVISION 32
32 05 23
32 12 16
32 17 23
09-26
EXTERIOR IMPROVEMENTS
Cement and Concrete for Exterior Improvements
Asphalt Paving
Pavement Markings
DIVISION 33
33 40 00
SPECIALTIES
09-26
09-26
09-26
UTILITIES
Storm Sewer Utilities
00 01 10-1
09-26
612A4-27-004 Correct Mather Loop
Road and Install Speed Bumps
09-22-26
SECTION 01 00 00
GENERAL REQUIREMENTS
1.11 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
1.19 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT (NOT
01 00 00 -1
612A4-27-004 Correct Mather Loop
Road and Install Speed Bumps
09-22-26
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor will remediate the existing pedestrian routes at Sacramento VA Medical Center Parking Lot 4 and crossing Denker St to Building 700. Contractor to furnish labor and materials to perform work as required by drawings and specifications.
Scope:
A. All employees of general contractor and subcontractors must speak and understand English during construction. Construction areas as defined by the contract documents will be keyed to a construction core when Notice to Proceed is issued. Access to non-construction areas is limited to public areas only. Access needed outside of construction area (i.e., mechanical rooms) will be provided by COTR or his/her representative upon written or verbal request.
C. Prior to commencing work, general contractor must provide proof that a maintain a presence at the work site whenever the general or subcontractors are present.
D. Training:
1. Beginning July 31, 2005, all employees of general contractor or subcontractors must have the 10-hour OSHA certified Construction Safety course and /or other relevant competency training, as
The beginning of the document. Download the full file to read on.