Section C - Description/Specifications/Statement of Work
GENERAL SPECIFICATIONS
Kent’s Lake Campground Road Reconstruction Project
FINAL – 05/02/2026
SCOPE OF CONTRACT
The Kent’s Lake Campground Reconstruction Project is part of the ongoing Great American Outdoors Act (GAOA) program. As part of the program, this project will focus on restoring the natural characteristics of the campground while accommodating capacity requirements with ongoing increases to recreational use within the forest and sizing requirements for vehicle use while staying in approved Forest Service Campgrounds. The work includes the following Base Bid Items (Quantities will be included in the attached Schedule of Items, but not limited to) The Kent's Lake Campground Reconstruction project is part of the ongoing Great American Outdoors Act (GAOA) program. As part of the program, this project will focus on restoring the natural characteristics of the campground while accommodating capacity requirements with ongoing increases to recreational use within the forest and sizing requirements for vehicle use while staying in approved Forest Service campgrounds. This project will consist of reconstruction/rehabilitation of the existing Kent's Lake Campground located 15 miles southeast of Beaver, Utah.The project will consist of (but not limited to these base bid items); reconstruction of the main campground loop road with adjacent pullouts, reconstruction of the day use area roadway with adding dedicated parking, rehabilitation of 30 rehabilitated individual family sites with improved access, rehabilitation of 1 family group site, improvements to the existing campground host site, addition of dedicated restroom parking for recently added vault restrooms, replacement of existing roadway information signs, replacement of 9 water hydrants, and improved drainage throughout the campground. several of the existing individual family sites will require the addition of rockery retaining walls, please verify retaining wall placement per the project drawings. Reinstallation of an existing pole to pole wood fence and standard stock gate will be required as part of the roadway realignment. The following items will be considered optional bid items and will consist of (but not limited to); addition of a day use picnic area (25' x 25' 6" thick concrete pad with reinforcement), 4 new picnic tables, and one (24' x 24') steel shade structure. Two separate concrete sidewalks (6" depth), one new water hydrant, and all necessary preparatory work for this designated area.
The beginning of the document. Download the full file to read on.