Home / Building 13 Stair and Roof Replacement at Castle Point VAMC / Document

Specifications Manual

Updated

A PDF document (3.8 MB) attached to Building 13 Stair and Roof Replacement at Castle Point VAMC, from the Department of Veterans Affairs. Due Nov 4, 2026, 10:00 AM (UTC-5).

File name: 620A4-25-201 Specifications Manual 04-30-26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PROJECT SPECIFICATIONS

General Construction
100% Construction Documents

VAMC, CASTLE POINT

BLDG. 13 – BRICK REPLACEMENT

& TUCKPOINTING

VA PROJECT NO. 620A4-25-201

Professional Seal

FELLENZER ENGINEERING, LLP

22 MULBERRY STREET

MIDDLETOWN, NY 10940

(845) 343-1481

FE PROJECT NO. 25-126

April 30, 2026

BLDG. 13 – BRICK REPLACEMENT & TUCKPOINTING

VAMC, CASTLE POINT

VA PROJECT #620A4-25-201

12-01-2025

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15

List of Drawing Sheets

05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00

01 00 00.01

01 32 00

01 32 16.15

01 33 23

01 33 23.01

01 35 26

01 42 19

01 45 00

01 45 29

01 45 35

01 57 19

01 74 19

01 81 13

01 91 00

General Requirements
Additional Security Badging Requirements
Construction Documentation
Project Schedules (Small Projects – Design/Bid/Build
Shop Drawings, Product Data, and Samples
Submittal Register
Safety Requirements for Major Projects
Reference Standards
Quality Control
Testing Laboratory Services
Special Inspections
Temporary Environmental Controls
Construction Waste Management
Sustainable Construction Requirements
General Commissioning Requirements

11-21
09-23
12-25
06-25
05-24
11-20
02-21
11-18
06-21
01-21
04-22
10-17
04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00

02 82 13

02 83 33.13

Demolition
Non-friable Roofing
Lead-Based Paint Removal and Disposal

08-17
02-26
01-21

DIVISION 03 – CONCRETE

03 30 00

Cast-in-Place Concrete

01-21

DIVISION 04 – MASONRY

04 01 00

04 05 13

04 20 00

04 43 01

Maintenance of Masonry
Masonry Mortaring
Unit Masonry
Masonry Restoration

01-21
10-17
08-17

DIVISION 05 – METALS

05 50 00

Metal Fabrications

08-18

00 01 10-1

BLDG. 13 – BRICK REPLACEMENT & TUCKPOINTING

VAMC, CASTLE POINT

VA PROJECT #620A4-25-201

12-01-2025

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00

Rough Carpentry

10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19

07 08 00

07 12 00

07 22 00

07 31 13

07 53 23

07 54 19

07 60 00

07 71 00

07 84 00

07 92 00

Preparation for Re-Roofing
Facility Exterior Closure Commissioning
Built-Up Bituminous Waterproofing
Roof and Deck Insulation
Asphalt Shingles
Ethylene-Propylene-Diene-Monomer Roofing
Polyvinyl-Chloride (PVC) Roofing
Flashing and Sheet Metal
Roof Specialties
Firestopping
Joint Sealants

01-21
01-21
01-21
01-21
02-21
01-21
12-18
01-21

The beginning of the document. Download the full file to read on.

Other documents in this bid