Specifications - Project 561-26-104
Updated
A PDF document (2.6 MB) attached to 561-26-104 Repair Operating Room (OR) & Bathroom Leaks, from the Department of Veterans Affairs. Due Nov 4, 2026, 1:00 PM (UTC-5).
File name: Specifications - Project 561-26-104.pdf
The full file is for paid members, or buy this bid alone.
Preview
VA Project No. 561-26-104
Repair OR Floor and Bathroom Leaks
VA NJ HCS East Orange Campus
August 2026
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
DIVISION AND SECTION TITLES
DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15
List of Drawing Sheets
05-2020
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 32 16.15
01 33 23
01 35 26
01 42 19
01 45 00
01 74 19
General Requirements
Project Schedules (Small Projects – Design/Bid/Build
Shop Drawings, Product Data, and Samples
Safety Requirements for Major Projects
Reference Standards
Quality Control
Construction Waste Management
06-2026
12-2025
03-2026
05-2024
11-2020
02-2021
04-2022
DIVISION 02 – EXISTING CONDITIONS
02 41 00
Demolition
08-2017
DIVISION 03 – CONCRETE
03 30 00
Cast-in-Place Concrete
01-2021
DIVISION 04 – MASONRY
NOT USED
DIVISION 05 – METALS
05 40 00
05 50 00
Cold-Formed Metal Framing
Metal Fabrications
01-2021
08-2018
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00
06 20 00
Rough Carpentry
Finish Carpentry
10-2017
01-2021
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00
07 92 00
Firestopping
Joint Sealants
01-2021
04-2022
00 01 10-1
VA Project No. 561-26-104
Repair OR Floor and Bathroom Leaks
VA NJ HCS East Orange Campus
August 2026
DIVISION 08 - OPENINGS
08 31 13
Access Doors and Frames
06-2025
DIVISION 09 – FINISHES
09 05 16
09 29 00
09 30 13
09 51 00
09.67.23.40
09 91 00
Subsurface Preparation for Floor Finishes
Gypsum Board
Ceramic/Porcelain Tiling
Acoustical Ceilings
Resinous Poured In Place Resilient Flooring (RES-4)
Painting
02-2026
04-2020
11-2025
12-2018
01-2021
01-2021
DIVISION 10 – SPECIALTIES
10 21 13
10 22 19
10 28 00
Toilet Compartments
Demountable Partitions
Toilet, Bath, and Laundry Accessories
01-2021
01-2021
01-2021
DIVISION 11 – EQUIPMENT
NOT USED
DIVISION 12 – FURNISHINGS
NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION
NOT USED
DIVISION 14– CONVEYING EQUIPEMENT
NOT USED
DIVISION 21- FIRE SUPPRESSION
21 13 13
Wet-Pipe Sprinkler Systems
06-2015
DIVISION 22 – PLUMBING
22 05 11
22 07 11
22 13 00
22 40 00
Common Work Results for Plumbing
Plumbing Insulation
Facility Sanitary and Vent Piping
Plumbing Fixtures
01-2023
09-2019
09-2020
05-2024
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 31 00
23 37 00
HVAC Ducts and Casings
Air Outlets and Inlets
DIVISION 25 – INTEGRATED AUTOMATION
NOT USED
DIVISION 26 – ELECTRICAL
00 01 10-2
03-2023
03-2023
VA Project No. 561-26-104
Repair OR Floor and Bathroom Leaks
The beginning of the document. Download the full file to read on.