Home / Vacuum Relief Furnace / Document

Specifications Sheet Vacuum Relief Furnace (002)

Updated

A PDF document (761 KB) attached to Vacuum Relief Furnace, from the Department of the Air Force. Due Nov 30, 2026, 10:00 AM (UTC-6).

File name: Specifications_Sheet__Vacuum_Relief_Furnace (002).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Technical Specifications Sheet:
Vacuum Relief Furnace
General Requirements
Furnace Type: Horizontal Front-Loading, Internal Gas Quench Vacuum Furnace. Condition: All components and materials used in the furnace must be brand-new. Compliance: The furnace system must conform to SAE Aerospace Material Specification (AMS) 2750G and National Fire Protection Association (NFPA) standards 70, 79, and 86D.

AF
T

•
•
•

Technical Specifications
Chamber and Hot Zone

Chamber: Double-walled, water-cooled, 304 stainless steel construction. Hot Zone: All-Metal insulated hot zone, to include an all-metallic shield pack. Usable Work Zone (minimum): 12" (W) x 12" (H) x 18" (D). Hearth Capacity: Minimum rated weight capacity of 250 pounds.

R

•
•
•
•

Performance

Maximum Operating Temperature: 2400∘ F (1315∘ C).
Maximum Cleanup Cycle Temperature: 2500∘ F (1371∘ C).
Temperature Uniformity: ±10∘ F at 1000∘ F, 1500∘ F, and 2100∘ F. Ultimate Vacuum: Must achieve a vacuum level in the 10−6 Torr range (clean, dry, empty).
Operating Vacuum: Must operate in the 10−5 Torr range.
Leak-Up Rate: Less than 5 microns per hour.

D

•
•
•
•
•
•

Subsystems
•

Vacuum Pumping System: vacuum system including a mechanical roughing pump (min. 35 SCFM), a high-vacuum diffusion pump (min. 6"), and a holding pump. The system must be fully interlocked for automatic, fail-safe operation.

•

•
•

Gas Quenching/Cooling System: Internal gas cooling system with a minimum 7.5 HP motor, designed for 2 bar (15 PSIG) positive pressure cooling using Nitrogen or Argon.
Partial Pressure System: Must include a system for running processes under partial pressure of Nitrogen and Argon gas.
Closed-Loop Water System: A self-contained, closed-loop water cooling system is required. The system must include a pump station with a minimum 40 GPM capacity, a power-loss diaphragm backup pump, and minimum two (2) dry coolers (fans) with 460V controls.

Control and Power Systems

•

Controller: Allen-Bradley (or equivalent) Programmable Logic Controller (PLC). Interface: Human Machine Interface (HMI) touchscreen display is required. Control & Data Logging: System must provide data to verify temperature uniformity across furnace
Power Supply: SCR-controlled hot zone power supply rated for a minimum of 65 KVA.

AF
T

•
•
•

Required Accessories

Manual Load Truck: A manual load truck designed for loading and unloading the furnace is required.

R

•

Training

Operator and Maintenance Training: The contractor shall provide training for

The beginning of the document. Download the full file to read on.

Other documents in this bid