SPI
Updated
A PDF document (157 KB) attached to Cancellation of BOAST RFOP - Diffuser Assembly - NSN: 2540-01-200-5821, from the Department of the Army. Due Nov 24, 2026, 4:00 PM (UTC-5).
File name: SPI AK12005821.pdf
The full file is for paid members, or buy this bid alone.
Preview
SPECIAL PACKAGING INSTRUCTION
Form Approved
OMB No. 0704-0188
-CC/TB
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THIS ADDRESS
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE
2. CODE IDENT
12324202 (19207) DIFFUSER ASSEMBLY
4. NATIONAL STOCK NUMBER
5. DATE OF DRAWING
2540-01-200-5821
7. QUP
8. ICQ
1 EA
3. SPI NO.
19207
AK12005821
6. REVISION
09-10-2002
9. UNIT PACK WT. (LB)
NONE
10. UNIT PACK CU (CU FT)
17.5
12. MILITARY PRESERVATION (METHOD)
18.
STEPS
C
11. UNIT PACK SIZE (INCHES)
2.157
19.
REQ’D
21.0 X 14.2 X 12.5
20.
DESCRIPTION
MIL-STD-2073-1D, METHOD 32
13. CLEANING
SEE NOTES
MIL-STD-2073-1D
14. DRYING
MIL-STD-2073-1D
15. PACKING
a. LEVEL A
MIL-STD-2073-1D AND NOTE I
b. LEVEL B
MIL-STD-2073-1D AND NOTE I
16. MARKING
MIL-STD-129
17. NOTES / DRAWING
A
REFER TO THE BILL OF MATERIALS FOR CIRCLED NUMBERS AND REFERENCED ITEM NUMBERS ON THE ACCOMPANYING PAGES.
B.
PREPARE PART BY PLACING TURRET AIRFLOW CONTROL HANDLE IN CLOSED POSITION BEFORE
WRAPPING.
C.
WRAP PART WITH WRAP, ITEM 1, AND SECURE WITH TAPE.
D.
PREPARE PADS, ITEMS 4, 5 AND 6, AND PLACE INTO CONTAINER, ITEM 7, AS ILLUSTRATED ON PAGE 3.
E.
PREPARE ROLLUPS, ITEMS 2 AND 3, AND PLACE INTO CONTAINER, ITEM 7, AS ILLUSTRATED ON PAGE 3.
F.
CLOSE CONTAINER, ITEM 7, IN ACCORDANCE WITH ASTM-D1974, METHOD 2B6.
G.
CLOSE BAG, ITEM 8, BY HEAT SEALING.
H.
CLOSE CONTAINER, ITEM 9, IN ACCORDANCE WITH ASTM-D1974, METHOD 2B3.
I.
LEVEL A: PACKING SHALL BE ACCOMPLISHED USING A CLEATED PLYWOOD BOX, CONFORMING TO ASTM-D6251, TYPE III, CLASS 1.
LEVEL B: THE UNIT CONTAINER IS AN ACCEPTABLE LEVEL B SHIPPING CONTAINER WHEN SEALED AND REINFORCED IN ACCORDANCE WITH ASTM-D1974, METHOD 2C OR 2D.
FOR BOTH LEVEL A AND LEVEL B, WHEN THE TOTAL QUANTITY TO BE SHIPPED TO THE SAME
The beginning of the document. Download the full file to read on.