SSN
Updated
A PDF document (381 KB) attached to USCGC Blackfin (WPB 87317) Drydock FY27, from the US Coast Guard. Due Nov 16, 2026, 11:00 AM (UTC-5).
File name: 70ZU0127PBPLBLACKFIN_SSN.pdf
The full file is for paid members, or buy this bid alone.
Preview
USCGC BLACKFIN (WPB 87317) DRYDOCK AVAILABILITY FY27
SOURCES SOUGHT NOTICE
USCGC BLACKFIN (WPB 87317) DRYDOCK FY27
70ZU0127PBPLBLACKFIN
This is a SOURCES SOUGHT NOTICE not a pre-solicitation notice or solicitation for proposals/quotations. Pursuant to FAR Class Deviation 25-06 Part 10 (Market Research), the purpose of this notice is to: (1) determine if sources capable of satisfying the agency's requirements exists, (2) determine if commercial items suitable to meet the agency's needs are available or could be modified to meet the agency's requirements, and (3) determine the commercial practices of company's engaged in providing the needed service or supply. Pursuant to FAR Class Deviation 25-11 Part 6 and FAR Class Deviation 26-03 (Rev. 1) Part 19, competition and set-aside decisions may be based on the results of this market research. This notice in no way obligates the Government to any further action.
REQUIREMENT: This notice is issued by the U.S. Coast Guard, Surface Forces Logistics Center, Norfolk, VA to identify sources capable of providing the following: SPECIFICATION: (Subject to change at the discretion of the Government). Contractor shall provide all necessary facilities, materials, equipment, and personnel to perform dockside repairs to the U.S. Coast Guard Cutter USCGC BLACKFIN (WPB 87317). The vessel is home ported in Santa Barbara, CA 93109. All work will be performed at the contractor’s facility. There is no geographical restriction for this cutter. SCOPE OF WORK: The scope of the acquisition is for the dockside repairs of the USCGC BLACKFIN (WPB 87317). This work will include, but is not limited to the following Work Items:
WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing WORK ITEM 2: Ultrasonic Thickness Measurements, Perform WORK ITEM 3: U/W Body, Preserve, 100 percent
WORK ITEM 4: Hull Plating Freeboard, Preserve, 100 Percent WORK ITEM 5: Tank, Dirty Oil, Clean and Inspect
WORK ITEM 6: Tank, Oily Water, Clean and Inspect
WORK ITEM 7: Tanks, MP Fuel Service, Clean and Inspect
WORK ITEM 8: Decks, Exterior (Main Deck), Preserve
WORK ITEM 9: Superstructure, Preserve, 100%
WORK ITEM 10: Capastic Fairing, Depth Sounder, Renew
WORK ITEM 11: Watertight Closures, Assess
WORK ITEM 12: Mast, Preserve (“100%”) – Contractor Interference Removal WORK ITEM 13: Main Diesel Engines (MDEs), Renew (W-6)
WORK ITEM 14: Main Engine/Reduction Gear, Realign
WORK ITEM 15: Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew
The beginning of the document. Download the full file to read on.