SSN Draft Performance Work Statement 1

Updated

A PDF document (216 KB) attached to Fire Alarm Panel Replacement(s), from the Bureau of Reclamation. Due Nov 17, 2026, 5:00 PM (UTC-8).

File name: SSN_Draft_Performance_Work_Statement_1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Performance Work Statement (PWS)
Central California Area Office
FOD and NBP Fire Alarm Control Panel Upgrade/Replacement

1.0 Background

A SimplexGrinnell 4100U Fire Alarm Control Panel (FACP) at Folsom Dam and Simplex 4020 Alarm Control Panel at Nimbus Powerplant have been in service at Folsom since 1990. Both panels have been showing trouble alrams and not been working properly. The efforts were made by plant and Folsom maintenance personnel to troubleshoot the problem and repairs. CCAO has put in a lot work hours to resolve the issue but has not been successful. The panels are very old and CCAO has decide to upgrade and replace the panels.
This is an urgent action. There is not an active system to notify personnel on site of a fire event (no audible alarm), or any remote communication to notify us of an event during off hours. CCAO will like to upgrade/replace these panels so that new FACPs communicate with all the devices including audibles and communicate with CCAO/CVO via our SCADA system (CVACS) in the event of any fire alarm/event.

1.1 Definitions

NFPA: National Fire Protection Association
CCAO: Central California Area Office
CVO: Central Valley Operations
CO: Contracting Officer
COR: Contracting Officers Representative
OGR: Onsite Government Representative
NICET: National Institute for Certification in Engineering Technologies CVACS: Central Valley Automated Control System
FOD Folsom Dam
NBP Nimbus Power Plant
2.0

Scope

Remove all components of existing FACP at FOD & NBP and reuse existing input and output wiring at the FACP boxes. Provide new batteries in panel boxes. Fully test the panel and the communication with all devices. “Bring-in” every device on all floors of the Folsom Dam & NBP to ensure functionality and sequencing according to the programming and as required by the NFPA. Adjust the programming at the panel as necessary. All work is localized at the panel except during testing when devices need to be initiated to determine functionality. The panels at both sites (FOD/NBP) must have remote notification/annunciation capability to Folsom power Plant control room desk via outputs from panel. Connections to CVACS will be made by CCAO staff. All other work shall be completed by the contractor except during the testing phase. It is recognized that testing is a multiple individual operation. Reclamation will provide the necessary individuals to assist the Contractor during testing. The anticipated work

is expected to take a 3-4 days per site (FOD and NBP).