USCGC TERN (WPB-87343)

DRYDOCK AVAILABILITY FY2027

SOURCES SOUGHT NOTICE

USCGC TERN (WPB-87343) DRYDOCK

70ZU0127QPBPLTERN

This is a SOURCES SOUGHT NOTICE / REQUEST FOR INFORMATION; not a

pre-solicitation notice or solicitation for proposals/quotations. Pursuant to FAR Part 10 (Market Research), the purpose of this notice is to: (1) determine if sources capable of satisfying the agency's requirements exists, (2) determine if commercial items suitable to meet the agency's needs are available or could be modified to meet the agency's requirements, and (3) determine the commercial practices of company's engaged in providing the needed service or supply. Pursuant to FAR Part 6 and FAR Part 19, competition and set-aside decisions may be based on the results of this market research. This notice in no way obligates the Government to any further action. REQUIREMENT: This notice is issued by the U.S. Coast Guard, Surface Forces Logistics Center, Norfolk, VA to identify sources capable of providing the following: SPECIFICATION: (Subject to change at the discretion of the Government). Contractor shall provide all necessary facilities, materials, equipment, and personnel to perform drydock repairs to the U.S. Coast Guard Cutter (USCGC) TERN (WPB-87343). The vessel is home ported in San Francisco, CA. All work will be performed at the contractor’s facility. There is no geographical restriction for this cutter. SCOPE OF WORK: The scope of the acquisition is for the drydock repairs of the USCGC TERN (WPB-87343). This work will include, but is not limited to the following Work Items:
WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing WORK ITEM 2: Ultrasonic Thickness Measurements, Perform WORK ITEM 3: U/W Body, Preserve, 100 percent
WORK ITEM 4: Hull Plating Freeboard, Preserve, 100 Percent WORK ITEM 5: Tank, Dirty Oil, Clean and Inspect
WORK ITEM 6: Tank, Oily Water, Clean and Inspect
WORK ITEM 7: Tanks, MP Fuel Service, Clean and Inspect
WORK ITEM 8: Decks, Exterior (Main Deck), Preserve
WORK ITEM 9: Superstructure, Preserve, 100%
WORK ITEM 10: Watertight Closures, Assess
WORK ITEM 11: Mast, Preserve (“100%”) – Contractor Interference Removal WORK ITEM 12: Main Diesel Engine Assemblies, Perform W-5 Maintenance And Update Control System Configuration
WORK ITEM 13: Main Engine/Reduction Gear, Realign
WORK ITEM 14: Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew WORK ITEM 15: Aft Water-Lubricated Propulsion Shaft Bearings, Renew