Statement of Work 2027 Painting IDIQ Contract Formatted (002)
Updated
A Word document (1.5 MB) attached to Hill AFB Painting ID/IQ Sources Sought, from the Department of the Air Force. Due Oct 29, 2026, 2:30 PM (UTC-6).
File name: Statement of Work_2027_Painting_IDIQ_Contract_Formatted (002).docx
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK (SOW)
PAINTING IDIQ CONTRACT
Document Type:
Statement of Work (SOW)
Contract:
Painting and Wall Coverings Construction Services IDIQ Contract Location:
Hill AFB, Little Mountain, UTTR
Status:
Final - Formatted
Project Manager:
Facility Number:
Capital Project:
Work Task:
TOC \o "1-3" \h \z \uTABLE OF CONTENTS PAGEREF _Toc242794964 \h 1
1. PART 1 — GENERAL/OBJECTIVE PAGEREF _Toc242794965 \h 3
1.1 OBJECTIVE PAGEREF _Toc242794966 \h 3
1.2 SCOPE OF WORK PAGEREF _Toc242794967 \h 3
General Standards & Colors PAGEREF _Toc242794968 \h 3
Specialized Painting Requirements PAGEREF _Toc242794969 \h 4
1.3 CONTRACTOR PERSONNEL RESPONSIBILITIES PAGEREF _Toc242794970 \h 5
1.4 SITE VISIT PAGEREF _Toc242794971 \h 5
1.5 CONTRACT DRAWINGS AND SPECIFICATIONS PAGEREF _Toc242794972 \h 6
1.6 SUBMITTALS PAGEREF _Toc242794973 \h 6
1.7 PROPRIETARY NAMES PAGEREF _Toc242794974 \h 6
1.8 STORAGE OF MATERIALS PAGEREF _Toc242794975 \h 6
1.9 WARRANTIES PAGEREF _Toc242794976 \h 7
1.10 WORK SCHEDULE PAGEREF _Toc242794977 \h 7
1.11 SAFETY REQUIREMENTS PAGEREF _Toc242794978 \h 8
1.12 COLD WEATHER PRECAUTIONS PAGEREF _Toc242794979 \h 9
1.13 PROTECTION OF GOVERNMENT PROPERTY AND PERSONNEL PAGEREF _Toc242794980 \h 9
1.14 HOUSEKEEPING AND DAILY CLEANUP PAGEREF _Toc242794981 \h 10
1.15 COVERING OF DEBRIS PAGEREF _Toc242794982 \h 10
1.16 REMOVALS AND SALVAGE PAGEREF _Toc242794983 \h 10
1.17 FINAL CLEANING PAGEREF _Toc242794984 \h 10
1.18 CLOSEOUT PROCEDURES PAGEREF _Toc242794985 \h 10
1.19 ENVIRONMENTAL PROTECTION PAGEREF _Toc242794986 \h 11
1.20 CONTRACTOR BASE IDENTIFICATION CREDENTIALS PAGEREF _Toc242794987 \h 13
1.21 POST-AWARD ORIENTATION/PRE-CONSTRUCTION CONFERENCES PAGEREF _Toc242794988 \h 15
1.22 CONTRACT PERFORMANCE PAGEREF _Toc242794989 \h 15
1.23 MODIFICATIONS PAGEREF _Toc242794990 \h 16
1.24 NOTICE OF CONSTRUCTION CHANGES PAGEREF _Toc242794991 \h 16
2. PART 2 — PRODUCTS (N/A) PAGEREF _Toc242794992 \h 17
3. PART 3 — EXECUTION (N/A) PAGEREF _Toc242794993 \h 18
4. PART 4 — APPENDIXES PAGEREF _Toc242794994 \h 19
4.1 SUBMITTAL CHECKLIST PAGEREF _Toc242794995 \h 19
4.2 CONTRACTOR'S NOTIFICATION OF HAZARDOUS MATERIAL REQUIREMENTS PAGEREF _Toc242794996 \h 19
4.3 MINIMUM EXPLOSIVE SAFETY AWARENESS PAGEREF _Toc242794997 \h 19
4.4 HILL AFB LANDFILL MAP PAGEREF _Toc242794998 \h 19
4.5 BASE SAFETY PLAN APPENDIX C PAGEREF _Toc242794999 \h 19
1. PART 1 — GENERAL/OBJECTIVE
1.1 OBJECTIVE
This is an Indefinite-Delivery Indefinite-Quantity (IDIQ) Contract for the execution of a Paint IDIQ contract for the real property at Hill Air Force Base (HAFB), as well as facility locations at Little Mountain Test Annex, Utah (LM), and Utah Test and Training Range (UTTR). Task Orders (TO) will be issued under this contract to define specific project requirements involving construction.
The beginning of the document. Download the full file to read on.