STATEMENT OF WORK

V-22 OTPS 8 UPGRADE LOAD BOX ASSEMBLY AND TEST

1.0 Objective

This Statement of Work (SOW) establishes the requirement for the build-to-print assembly, contractor testing, packaging, and delivery of forty-eight (48) copies each of the load box assemblies required for the V-22 OTPS 8 Upgrade for use on the Navy’s Consolidated Automated Support System (CASS) family of Automated Test Equipment (ATE).

2.0 Applicable Documents

2.1 Government Documents

Attachment 1 – MIL-PRF-32070A, Performance Specification for Test Program Sets

3.0 Requirements

3.1 General

The contractor shall provide all labor, supervision, assembly, testing, documentation, packaging, and delivery necessary to support Fleet Readiness Center East (FRC-East), Cherry Point, NC, Code ATS10, in execution of the OTPS Manufacturing and Assembly project as assigned by Naval Air Systems Command (NAVAIR) Headquarters, PMA-275.

The contractor shall assemble and test, in accordance with the Government-furnished Technical Data Package (TDP), forty-eight (48) copies each of the load box assemblies required for the V-22 OTPS 8 Upgrade. These assemblies will be used on the Navy’s CASS family of ATE to test the functionality of the MAO DSIU and FMU Unit Under Test (UUT).

3.2 Program Management

The contractor shall provide monthly status reports throughout contract performance. Status reports shall address, at a minimum:

Assembly progress

Testing status

Material issues

Schedule status

Problems encountered

Corrective actions taken or planned

The purpose of the monthly reporting requirement is to provide visibility into contract execution and support timely resolution of issues affecting schedule or performance.

3.3 Assembly Requirements

The Government shall furnish the parts and material necessary for assembly of the required load box hardware. Upon receipt, the contractor shall review Government-furnished material for completeness and suitability for assembly of the required end items.

The contractor shall assemble the end items identified in Table 1 in accordance with the Government-furnished TDP.

Table 1. OTPS Load Box Assemblies
NomenclaturePart NumberQuantity
Load Box Assembly, WLB118D90975-148
Load Box Assembly, WLB218D90976-148
Load Box Assembly, WLB318D90977-148

The contractor shall:
a. Assemble all load box hardware in accordance with the TDP. b. Verify completeness and workmanship of all assemblies. c. Identify and report any material shortages, defects, or drawing discrepancies to the Government.