STATEMENT OF WORK (SOW)

FI-MUE Replace Zama DSN-HHD Generator
78th Signal Battalion
Camp Zama, Japan

24 Aug 2026

FA520926Q0077
Attachment 1

1. INTRODUCTION

This Statement of Work (SOW) defines the requirements, scope, responsibilities, and deliverables for the replacement and disposal of the 150kVA emergency power diesel generator located on Camp Zama Japan Building 121.

2. SCOPE OF WORK

The contractor shall provide all necessary materials, equipment, labor, and services to: 2.1. Decommissioning and Removal of Existing Generator. •
•
•
•
•

Disconnection from the electrical distribution system.
Safe removal of residual fuel and proper disposal as per environmental regulations. Safe removal of coolant and oil and proper disposal as per environmental regulations. Disassembly and transport of the existing generator from the site (Bldg. 121, Camp Zama) to an authorized disposal facility.
Removal disposal of old conduits and exhaust piping that cannot be re-used for the new generator system.

2.2. Disposal and Environmental Compliance

•
•
•

Disposal of the generator, engine, batteries, coolant, oils, shall be completed by the contractor utilizing off-base location.
Proper handling and disposal of hazardous materials, including oil, fuel, and battery components.
Contractor shall provide a copy of the receipt of disposal of any hazardous waste to the Government Representative (GR) of this contract for recorded keeping.

2.3. Installation of New Generator

•
•
•
•

•
•

•

Site preparation, including foundation modifications if required. Delivery and offloading of the new generator.
Installation and secure anchoring of the generator unit. Electrical integration with the existing power panel and ATS. Contractor is permitted to reuse existing wires and conduits from Panel L-M-2 to the generator pending they reach without the need for splicing. Splicing of wires is not permitted.
Connection and modification of exhaust system. The contractor may reuse existing exhaust piping to avoid new holes and core drilling of the outside wall. The contractor shall also utilize all existing air intake ducts, both internal and external, for compatibility. The contractor is encouraged and permitted to re-use the existing fuel piping and radiator exhaust ducting, provided that they are thoroughly inspected, tested, and certified by the contractor to be in fully functional, safe, and leak-free condition prior to the integration with